Summary for Test 2025-08-29-12-2
Test performed: AASHTO T240-23Project Information
| Project Identifiers | Project ID: 215220 DEA: 07210624 EFIS: 0719000068 |
|---|---|
| DIST-CO-RTE-PM | 07-LA,SBD-71-1.8/R4.7&R0.0/R0.2 |
| Award Date | 02/05/2021 |
| Closeout Date | Not set |
| Work Description | PLACE STRUCTURE CONCRETE RETAINING WALLS & BOX CULVERT AND PLACE JPCP. |
| Location Description | IN LOS ANGELES AND SAN BERNARDINO COUNTIES IN POMONA AND CHINO HILLS FROM 0.2 MILE SOUTH OF MISSION BOULEVARD OVERCROSSING TO 0.2 MILE OF SAN BERNARDINO COUNTY LINE. |
| QA Service Level | 1 (Verified on 03/24/2021) |
Sample Information
| Sample Taken Date | 08/29/2025 | Sample Unique Key | 12 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/03/2025 |
| Sample type | Verification | A brief description of the sample | Asphalt Binder Sample |
| The quantity of what the sample constitutes | 1can | From where was the sample collected | Source |
| First name of sampler or witnessed by | Gerry | Last name of sampler or witnessed by | Zubieta |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | All American Asphalt Corona | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 64-10 |
|---|---|---|---|
| Modified | Lot number | ||
| Sublot number | Tank number | ||
| Time of sample | HMA Supplier | ||
| Certified Asphalt Supplier | San Joaquin Refinery - Bakersfield CA | Multigrade | No |
| Multigrade Type | Asphalt Binder Mix Number |
Test Details
DIME Sample ID: 2025-08-29-12
DIME Test ID: 2025-08-29-12-2
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T240-23: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2025-10-08
Test Results
Is mass change based on one or two containers?: Two
Is mass change correction factor needed?: Yes
Input Type: Measured
Tester's full name: Angelito Villegas
Date of test: 09/04/2025
Any material loss from containers during heating process/testing?: No
Mass of container #1 before test (m1i): 203.866 grams
Mass of container #2 before test (m2i): 206.503 grams
Mass of container #1 after test (m1f): 203.781 grams
Mass of container #2 after test (m2f): 206.440 grams
Mass of empty container #1: 168.841 grams
Mass of empty container #2: 171.475 grams
Mass correction factor: 0.006
Average mass change: -0.205 percent
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 10/8/2025 ✔
