Summary for Test 2025-09-05-15-1

Test performed: CTM 342-August 2012

Project Information

Project IdentifiersProject ID: 211462
DEA: 063HT004
EFIS: 0600020143
DIST-CO-RTE-PM06-KIN--
Award DateNot set
Closeout DateNot set
Work DescriptionNot set
Location DescriptionNot set
QA Service Level2 (Verified on 05/12/2016)

Sample Information

Sample Taken Date09/05/2025 Sample Unique Key15
Will the laboratory/organization for which you are a member perform testing on this material sample?No Date that the sample was received by the laboratory/organization performing the testing09/17/2025
Sample typeQuality Assurance A brief description of the sampleskid test
The quantity of what the sample constitutesMultiple Lanes From where was the sample collectedJob Site
First name of sampler or witnessed byDon Last name of sampler or witnessed byCtibor
Title of samplerRE Telephone number of sampler5599397402
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameViking Redi Mix Hanford Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier16-45C0157
Structure nameHanford Armona Rd Bid ItemNot set

Material Information

Material TypeRoadway/Bridge Surface Pavement Surface TypePCC (Portland Cement Concrete)
Type of Traffic Control ProvidedN/A DIST-CO-RTE
Direction of TravelWest Post Mile15.08
Lanes to be TestedShoulder,Lane #1 Station

Test Details

DIME Sample ID: 2025-09-05-15
DIME Test ID: 2025-09-05-15-1
Testing Lab: CT HQ - FFS - Skid Testing
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2025-10-02

Test Results


Pavement or Bridge Deck?: Bridge Deck
Input Type: Measured
Tester's full name: HARISH THAKUR
Date of test: 10/01/2025
Air Temperature: 60
Tire Pressure: 25
Equipment PST #: 1000-7/1000-8
Is Calibration within ± values: Yes
Weather: COOL
Direction/Lane #: EB: Eastbound Direction of Travel
Edge used to measure reference distance: END OF BRIDGE
Edge used to measure position: LEFT OF WALL
Reference Distance 1: 71
Reference Distance 2: 74
Reference Distance 3: 77
Direction and Lane # for Stationing 1: no data
Direction and Lane # for Stationing 2: no data
Direction and Lane # for Stationing 3: no data
Position for Stationing 1: 12
Position for Stationing 2: 12
Position for Stationing 3: 12
Percent Grade for 1st Stationing: 0.0
Percent Grade for 2nd Stationing: 0.0
Percent Grade for 3rd Stationing: 0.0
Corrected Coefficients of Friction for Stationing 1: 0.37
Corrected Coefficients of Friction for Stationing 2: 0.37
Corrected Coefficients of Friction for Stationing 3: 0.35
Average Coefficient of Friction: 0.36
General comments (publicly viewable) (Max 1000 characters): HANFORD ARMONA RD WB-.33/.37/.35=.35 AVG PRIVATE SIDE-.36/.36/.35=.36 AVG BOTH COMPLY

Test was verified on 10/2/2025