Summary for Test 2025-09-03-50-5
Test performed: AASHTO T240-23Project Information
| Project Identifiers | Project ID: 1000698 DEA: 024H0704 EFIS: 0218000074 |
|---|---|
| DIST-CO-RTE-PM | 02-LAS-139-0.74/11.0 |
| Award Date | 01/29/2025 |
| Closeout Date | Not set |
| Work Description | PLACE HMA (TYPE A), TRAFFIC CONTROL SYSTEM, TRAFFIC STRIPE, RDWY EXC. |
| Location Description | LASSEN COUNTY NEAR SUSANVILLE FROM 0.1 MILE NORTH OF CHESTNUT STREET TO 2.6 MILES SOUTH OF HORSE LAKE ROAD |
| QA Service Level | 1 (Verified on 10/24/2024) |
Sample Information
| Sample Taken Date | 09/03/2025 | Sample Unique Key | 50 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/11/2025 |
| Sample type | Quality Assurance | A brief description of the sample | PG 58-34 |
| The quantity of what the sample constitutes | 2 Cans | From where was the sample collected | Source |
| First name of sampler or witnessed by | Joe | Last name of sampler or witnessed by | Delgado |
| Title of sampler | Consultant | Telephone number of sampler | |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Hat Creek Construction | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | 876953 | Structure unique identifier | |
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 58-34 |
|---|---|---|---|
| Modified | No | Lot number | |
| Sublot number | Tank number | ||
| Time of sample | HMA Supplier | ||
| Certified Asphalt Supplier | Albina Asphalt (Klamath Falls Plant) - Klamath Falls OR | Multigrade | No |
| Multigrade Type | Asphalt Binder Mix Number |
Test Details
DIME Sample ID: 2025-09-03-50
DIME Test ID: 2025-09-03-50-5
Testing Lab: Atlas - Denver
Test Method: AASHTO T240-23: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2025-10-03
Test Results
Is mass change based on one or two containers?: Two
Is mass change correction factor needed?: Yes
Input Type: Measured
Tester's full name: Atlas
Date of test: 09/26/2025
Any material loss from containers during heating process/testing?: No
Mass of container #1 before test (m1i): 207.684 grams
Mass of container #2 before test (m2i): 210.768 grams
Mass of container #1 after test (m1f): 207.359 grams
Mass of container #2 after test (m2f): 210.453 grams
Mass of empty container #1: 173.081 grams
Mass of empty container #2: 176.126 grams
Mass correction factor: 0.030
Average mass change: -0.894 percent
General comments (publicly viewable) (Max 1000 characters): Mass Change
Test was verified on 10/3/2025 ✔
