Summary for Test 2025-09-03-50-6
Test performed: AASHTO T313-22Project Information
| Project Identifiers | Project ID: 1000698 DEA: 024H0704 EFIS: 0218000074 |
|---|---|
| DIST-CO-RTE-PM | 02-LAS-139-0.74/11.0 |
| Award Date | 01/29/2025 |
| Closeout Date | Not set |
| Work Description | PLACE HMA (TYPE A), TRAFFIC CONTROL SYSTEM, TRAFFIC STRIPE, RDWY EXC. |
| Location Description | LASSEN COUNTY NEAR SUSANVILLE FROM 0.1 MILE NORTH OF CHESTNUT STREET TO 2.6 MILES SOUTH OF HORSE LAKE ROAD |
| QA Service Level | 1 (Verified on 10/24/2024) |
Sample Information
| Sample Taken Date | 09/03/2025 | Sample Unique Key | 50 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/11/2025 |
| Sample type | Quality Assurance | A brief description of the sample | PG 58-34 |
| The quantity of what the sample constitutes | 2 Cans | From where was the sample collected | Source |
| First name of sampler or witnessed by | Joe | Last name of sampler or witnessed by | Delgado |
| Title of sampler | Consultant | Telephone number of sampler | |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Hat Creek Construction | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | 876953 | Structure unique identifier | |
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 58-34 |
|---|---|---|---|
| Modified | No | Lot number | |
| Sublot number | Tank number | ||
| Time of sample | HMA Supplier | ||
| Certified Asphalt Supplier | Albina Asphalt (Klamath Falls Plant) - Klamath Falls OR | Multigrade | No |
| Multigrade Type | Asphalt Binder Mix Number |
Test Details
DIME Sample ID: 2025-09-03-50
DIME Test ID: 2025-09-03-50-6
Testing Lab: Atlas - Denver
Test Method: AASHTO T313-22: Standard Method of Test for Determining the Flexural Creep Stiffness of Asphalt Binder Using the Bending Beam Rheometer (BBR)
Test Release Date: 2025-10-03
Test Results
Input Type: Measured
Tester's full name: Atlas
Date of test: 09/26/2025
Minimum test bath temperature at 240 s: -24.1 C
Maximum test bath temperature at 240 s: -23.9 C
Time of test load application: no data
File name of test data: no data
Time beam in bath: no data
Time test started: no data
Flags issued by software during test: no data
Correlation coefficient (R²): 0
Regression coefficient a: no data
Regression coefficient b: no data
Regression coefficient c: no data
Load at time 0.0: 0.0 mN
Deflection at time 0.0 s: 0.000 µm
Load at time 0.5 s: 0.0 mN
Deflection at time 0.5 s: 0.000 µm
Load at 60.0 s: 0.0 mN
Beam deflection 60.0 s: 0.000 µm
Measured Stiffness Modulus 60.0 s: no data
Estimated Stiffness Modulus 60.0 s: 368.000 MPa
Difference between stiffness moduli 60.0 s: no data
Estimated m-value 60.0 s: 0.278
General comments (publicly viewable) (Max 1000 characters): BBR
Test was verified on 10/3/2025 ✔
