Summary for Test 2025-09-13-7-4
Test performed: AASHTO T269-14Project Information
| Project Identifiers | Project ID: 1000402 DEA: 11430384 EFIS: 1118000114 |
|---|---|
| DIST-CO-RTE-PM | 11-SD-805-23.7/28.5 |
| Award Date | 10/09/2024 |
| Closeout Date | Not set |
| Work Description | REPLACE DRAINAGE, CONCRETE PAVEMENT, AND MODIFY ELECTRICAL SYSTEMS. |
| Location Description | SAN DIEGO COUNTY IN SAN DIEGO FROM 0.1 MILE NORTH OF ROUTE 805/52 SEPARATION TO ROUTE 5/805 SEPARATION |
| QA Service Level | 1 (Verified on 11/18/2024) |
Sample Information
| Sample Taken Date | 09/13/2025 | Sample Unique Key | 7 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/15/2025 |
| Sample type | Production Start-Up | A brief description of the sample | RPSU |
| The quantity of what the sample constitutes | 12 boxes | From where was the sample collected | Supplier |
| First name of sampler or witnessed by | Gerardo | Last name of sampler or witnessed by | Cordero |
| Title of sampler | TET | Telephone number of sampler | 6199366795 |
| Laboratory sample identification | 25-09-13-7-RPSU | Linked DIME Sample ID | 2025-09-13-8 |
| The fabricator/manufacturer/facility name | Martin Marietta | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | RHMA-G |
|---|---|---|---|
| HMA Grading | 1/2 inch | Lot number | |
| Sublot number | HMA Mix Number | 21218180AH MM | |
| Binder content (%) | 7.5 | Virgin binder PG | PG 64-16 |
| Design binder PG | PG 64-16 | Binder Supplier | Valero |
| RAP content (%) | 0 | WMA Additives | No |
| Antistrip type | Liquid |
Test Details
DIME Sample ID: 2025-09-13-7
DIME Test ID: 2025-09-13-7-4
Testing Lab: CT D11 - District 11 Materials Laboratory
Test Method: AASHTO T269-14: Standard Method of Test for Percent Air Voids in Compacted Dense and Open Asphalt Mixtures (Air Void)
Test Release Date: 2025-09-30
Test Results
Number of tests: 3
Is the sample lab compacted or field compacted?: Lab compacted
Input Type: Measured
Tester's full name: Daniel Smith
Date of test: 09/29/2025
| 1 | 2 | 3 | ||||
|---|---|---|---|---|---|---|
| 2.278 | 2.281 | 2.277 | ||||
| 2.424 | ||||||
6.0 % | 5.9 % | 6.1 % | ||||
6.0 % | ||||||
General comments (publicly viewable) (Max 1000 characters): Does Not Comply - Target 4.0 % +/- 1.5 % Tested an Avg of 6.0%
Test was verified on 9/30/2025 ✔