Summary for Test 2025-09-14-17-2
Test performed: AASHTO T240-23Project Information
| Project Identifiers | Project ID: 1001223 DEA: 070W2104 EFIS: 0721000087 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-2-R18.7 |
| Award Date | 06/23/2025 |
| Closeout Date | Not set |
| Work Description | PLACE CLASS 3 AGGREGATE BASE AND HOT MIX ASPHALT. |
| Location Description | LOS ANGELES COUNTY IN LOS ANGELES AT LOS ANGELES REGIONAL TRANSPORTATION MANAGEMENT CENTER AT 2901 AT WEST BROADWAY |
| QA Service Level | 1 (Verified on 07/02/2025) |
Sample Information
| Sample Taken Date | 09/14/2025 | Sample Unique Key | 17 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/19/2025 |
| Sample type | Verification | A brief description of the sample | Asphalt Binder Sample |
| The quantity of what the sample constitutes | 1can | From where was the sample collected | Source |
| First name of sampler or witnessed by | Vulcan QC | Last name of sampler or witnessed by | Vulcan QC |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Vulcan Sun Valley - Blvd. | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 58-16 |
|---|---|---|---|
| Modified | Lot number | ||
| Sublot number | Tank number | ||
| Time of sample | HMA Supplier | ||
| Certified Asphalt Supplier | San Joaquin Refinery - Bakersfield CA | Multigrade | No |
| Multigrade Type | Asphalt Binder Mix Number |
Test Details
DIME Sample ID: 2025-09-14-17
DIME Test ID: 2025-09-14-17-2
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T240-23: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2025-10-01
Test Results
Is mass change based on one or two containers?: Two
Is mass change correction factor needed?: Yes
Input Type: Measured
Tester's full name: Angelito Villegas
Date of test: 09/29/2025
Any material loss from containers during heating process/testing?: No
Mass of container #1 before test (m1i): 203.767 grams
Mass of container #2 before test (m2i): 206.428 grams
Mass of container #1 after test (m1f): 203.545 grams
Mass of container #2 after test (m2f): 206.201 grams
Mass of empty container #1: 168.839 grams
Mass of empty container #2: 171.471 grams
Mass correction factor: 0.006
Average mass change: -0.636 percent
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 10/1/2025 ✔
