Summary for Test 2025-09-24-29-2
Test performed: CTM 216-June 2011Project Information
| Project Identifiers | Project ID: 995193 DEA: 07356604 EFIS: 0719000026 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-605-R10.2/20.2 |
| Award Date | 04/04/2024 |
| Closeout Date | Not set |
| Work Description | LANE & SLAB REPLACEMENT, COLD PLANE & HMA OVERLAY. |
| Location Description | LOS ANGELES COUNTY IN SANTA FE SPRINGS, PICO RIVERA, WHITTIER, CITY OF INDUSTRY AND EL MONTE FROM TELEGRAPH ROAD UNDERCROSSING TO ROUTE 605/10 SEPARATION |
| QA Service Level | 1 (Verified on 10/03/2023) |
Sample Information
| Sample Taken Date | 09/24/2025 | Sample Unique Key | 29 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 09/24/2025 | Sample type | Quality Assurance |
| A brief description of the sample | Class 2 Aggregate Base | The quantity of what the sample constitutes | 486 SY |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Michael |
| Last name of sampler or witnessed by | Dillon | Title of sampler | Materials Tester |
| Telephone number of sampler | 909-701-8239 | Laboratory sample identification | 25-3133 |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | N/A | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | NB 605 Rose Hills On-Ramp Gore Area | |
| Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | N/A |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | Class 2 aggregate base | The fabricator/manufacturer designation for the sample | Compactions Testing |
| The plant number | A detailed description of where the material sample was collected | Jobsite | |
| Where the material sample would have been placed if not sampled | Jobsite | Primary Aggregate Nominal Size | 3/4 inch |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2025-09-24-29
DIME Test ID: 2025-09-24-29-2
Testing Lab: Alta Vista Solutions - Whittier
Test Method: CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates
Test Release Date: 2025-09-25
Test Results
Is oversize material: No
Input Type: Measured
Tester's full name: Michael Dillon
Date of test: 09/24/2025
In-place wet density: 2.15
Highest adjust wet density: 2.26
% Moisture: 7.5 %
Optimum Moisture: 7.5 %
Relative compaction: 95
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/25/2025 ✔
