Summary for Test 2025-09-16-67-1

Test performed: CTM 203-February 2008

Project Information

Project IdentifiersProject ID: 995524
DEA: 021H3604
EFIS: 0216000040
DIST-CO-RTE-PM02-SIS-96-76.8/78.0
Award Date03/22/2024
Closeout Date12/29/2025
Work DescriptionREPLACE BRIDGE.
Location DescriptionSISKIYOU COUNTY NEAR HORSE CREEK FROM 0.4 MILE WEST OF KLAMATH RIVER BRIDGE TO 2.0 MILES WEST OF KOHL CREEK
QA Service Level1 (Verified on 12/27/2023)

Sample Information

Sample Taken Date09/16/2025 Sample Unique Key67
Date that the sample was received by the laboratory/organization performing the testing09/18/2025 Sample typeInformational
A brief description of the sample2 bags of Soil (gravel with sand and fines) The quantity of what the sample constitutesGravel Filter Recommendation at L03
From where was the sample collectedJob Site First name of sampler or witnessed byTony
Last name of sampler or witnessed byZalik Title of samplerPE
Telephone number of sampler Laboratory sample identificationD80040
Linked DIME Sample ID The fabricator/manufacturer/facility nameIn Situ
Transportation Laboratory (TL) Number1 Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sample
The fabricator/manufacturer designation for the sample A detailed description of where the material sample was collectedFuture RSP location at 41.82785°N, 122.97819°W; 0 – 1' depth
Where the material sample would have been placed if not sampled

Test Details

DIME Sample ID: 2025-09-16-67
DIME Test ID: 2025-09-16-67-1
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: CTM 203-February 2008: Mechanical Analysis of Soils
Test Release Date: 2025-09-24

Test Results


What size aggregate is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
Input Type: Calculated
Tester's full name: Josh Murphy
Date of test: 09/24/2025
Cumulative percent passing the 3 in. sieve: 97 %
Cumulative percent passing the 2 1/2 in. sieve: 91 %
Cumulative percent passing the 2 in. sieve: 90 %
Cumulative percent passing the 1 1/2 in. sieve: 87 %
Cumulative percent passing the 1 in. sieve: 82 %
Cumulative percent passing the 3/4 in. sieve: 78 %
Cumulative percent passing the 1/2 in. sieve: 73 %
Cumulative percent passing the 3/8 in. sieve: 70 %
Cumulative percent passing the #4 sieve: 63 %
Cumulative percent passing the #8 sieve: 58 %
Cumulative percent passing the #16 sieve: 54 %
Cumulative percent passing the #30 sieve: 49 %
Cumulative percent passing the #50 sieve: 43 %
Cumulative percent passing the #100 sieve: 37 %
Cumulative percent passing the #200 sieve: 31 %
Cumulative Percent Passing on 5 Microns: 5 %
Cumulative Percent Passing on 1 Micron: 4 %
General comments (publicly viewable) (Max 1000 characters): D₈₅=32.6-mm, D₅₀=677-μm, D₁₅=29-μm

Test was verified on 9/24/2025 ✔