Summary for Test 2025-08-29-19-1
Test performed: CTM 231-March 2013Project Information
| Project Identifiers | Project ID: 214649 DEA: 07316004 EFIS: 0715000194 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-14-60.70 |
| Award Date | 02/07/2023 |
| Closeout Date | Not set |
| Work Description | REHABILITATION FOR THE ON/OFF RAMPS AND ADJACENT SHOULDERS. UPGRADING METAL BEAM GUARDRAILS, AC DIKES, SIGN PANELS, CURB RAMPS, TRAFFIC LOOPS DETECTORS, AND SOME OTHER HIGHWAY APPURTENANCES. |
| Location Description | ROUTE 14 FROM PALMDALE BLVD TO KERN COUNTRY LINE. |
| QA Service Level | 1 (Verified on 01/29/2020) |
Sample Information
| Sample Taken Date | 08/29/2025 | Sample Unique Key | 19 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/29/2025 |
| Sample type | Quality Assurance | A brief description of the sample | Native |
| The quantity of what the sample constitutes | 1,686 SY | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Rigoberto | Last name of sampler or witnessed by | Arroyo |
| Title of sampler | Materials Tester | Telephone number of sampler | 7605743880 |
| Laboratory sample identification | 25-2896 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | n/a | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | SB SR-14 Mainline/Ave M SB on ramp loop | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | n/a |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | Native | The fabricator/manufacturer designation for the sample | Compactions Testing |
| The plant number | A detailed description of where the material sample was collected | Jobsite | |
| Where the material sample would have been placed if not sampled | Jobsite | Primary Aggregate Nominal Size | 3/4 inch |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2025-08-29-19
DIME Test ID: 2025-08-29-19-1
Testing Lab: Alta Vista Solutions - Whittier
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2025-09-18
Test Results
Method Type:: Direct Read
Number of Tests:: 5
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Rigoberto Arroyo
Date of test: 08/29/2025
Gage No.: 34188
Test No.: 194.1
Nuclear By: Rigoberto Arroyo
Non-Bias Plan No.: 1
Depth: 7"
Material No.: Native
Material Type: Subgrade
Impact By: Rigoberto Arroyo
Standard Count Density: 1630 g/cc
Count or Density 1: 1266 g/cc
Count or Density 2: 1252 g/cc
Count or Density 3: 1317 g/cc
Count or Density 4: 1104 g/cc
Count or Density 5: 1271 g/cc
Standard Count Moisture: 665 g/cc
Moisture Count 1: 83 g/cc
Moisture Count 2: 90 g/cc
Moisture Count 3: 114 g/cc
Moisture Count 4: 81 g/cc
Moisture Count 5: 83 g/cc
Sum of Count or Density: 6210 g/cc
Average of Count or Density: 1242 g/cc
Sum of Moisture Count: 451 g/cc
Average of Moisture Count: 90.2 g/cc
Calculated Percent Relative Compaction: 96.3 %
Reported Percent Relative Compaction: 96 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/18/2025 ✔
