Summary for Test 2025-08-29-1-1

Test performed: CTM 342-August 2012

Project Information

Project IdentifiersProject ID: 1000268
DEA: 070W6504
EFIS: 0722000358
DIST-CO-RTE-PM07-LA-1,90,105,110,405-Var
Award Date06/27/2024
Closeout DateNot set
Work DescriptionSTRUCTURAL CONC, APPROACH SLAB, POLYESTER CONC OVERLAY, & JOINT SEAL.
Location DescriptionLOS ANGELES COUNTY AT VARIOUS LOCATIONS
QA Service Level1 (Verified on 09/16/2024)

Sample Information

Sample Taken Date08/29/2025 Sample Unique Key1
Will the laboratory/organization for which you are a member perform testing on this material sample?No Date that the sample was received by the laboratory/organization performing the testing08/29/2025
Sample typeAcceptance A brief description of the sampleSkid Testing Request
The quantity of what the sample constitutesMultiple Lanes From where was the sample collectedJob Site
First name of sampler or witnessed byBasma Last name of sampler or witnessed byElberry
Title of samplerAssistant Structure Representative Telephone number of sampler(213) 793-9597
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility namePeterson Chase Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier53-0741
Structure nameVentura Blvd UC Bid ItemNot set

Material Information

Material TypeRoadway/Bridge Surface Pavement Surface TypePolyester Concrete
Type of Traffic Control ProvidedStationary Lane Closure DIST-CO-RTE07-LA-405
Direction of TravelNorth Post Mile39.00
Lanes to be TestedShoulder,Lane #1,Lane #2,Lane #3,Lane #4,Lane #5 Station

Test Details

DIME Sample ID: 2025-08-29-1
DIME Test ID: 2025-08-29-1-1
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2025-09-18

Test Results


Pavement or Bridge Deck?: Bridge Deck
Input Type: Measured
Tester's full name: Jose Guzman
Date of test: 09/14/2025
Air Temperature: 66
Tire Pressure: 25
Equipment PST #: 1000-3
Is Calibration within ± values: Yes
Weather: clear
Direction/Lane #: NB: Northbound Direction of Travel
Edge used to measure reference distance: begining of deck
Edge used to measure position: 21' left of meidan wall
Reference Distance 1: 21'
Reference Distance 2: 19'
Reference Distance 3: 17'
Direction and Lane # for Stationing 1: nb
Direction and Lane # for Stationing 2: nb
Direction and Lane # for Stationing 3: nb
Position for Stationing 1: 21
Position for Stationing 2: 19
Position for Stationing 3: 17
Percent Grade for 1st Stationing: -1.0
Percent Grade for 2nd Stationing: -1.0
Percent Grade for 3rd Stationing: -1.0
Corrected Coefficients of Friction for Stationing 1: 0.47
Corrected Coefficients of Friction for Stationing 2: 0.46
Corrected Coefficients of Friction for Stationing 3: 0.46
Average Coefficient of Friction: 0.46
General comments (publicly viewable) (Max 1000 characters): Please perform skid test for Polyester Concrete Overlay at 7:00 AM (0700 hours) on Sunday, 9/14/25 on the 405 Freeway Northbound at the Ventura Blvd UC Bridge. This bridge is located on the Northbound 405 Freeway, just South of the 101 Freeway. Polyester

Test was verified on 9/18/2025