Summary for Test 2025-08-14-114-1

Test performed: CTM 217-June 2011

Project Information

Project IdentifiersProject ID: 994422
DEA: 044A4414
EFIS: 0400020584
COOP: 04042909
DIST-CO-RTE-PM04-SOL-37-10.2/11.2
Award DateNot set
Closeout DateNot set
Work DescriptionNot set
Location DescriptionNot set
QA Service Level2 (Verified on 04/07/2023)

Sample Information

Sample Taken Date08/14/2025 Sample Unique Key114
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing08/14/2025
Sample typeQuality Control A brief description of the samplerecycled AB
The quantity of what the sample constituteson site plant From where was the sample collectedJob Site
First name of sampler or witnessed byScott Last name of sampler or witnessed byKrietzburg
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameN/A Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)n/a
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedStockpile
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size3/4 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2025-08-14-114
DIME Test ID: 2025-08-14-114-1
Testing Lab: Construction Testing Services
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2025-09-17

Test Results


Number of tests: 3
Input Type: Calculated
Tester's full name: M. Mahurin
Date of test: 08/14/2025
Temperature correction: 0
Temperature of solution: 72
Clay reading (test 1): 4.8
Sand reading (test 1): 3.3
Clay reading (test 2): 4.4
Sand reading (test 2): 3.1
Clay reading (test 3): 4.5
Sand reading (test 3): 3.1
Sand equivalent (test 1): 69
Sand equivalent (test 2): 71
Sand equivalent (test 3): 69
Sand equivalent before temperature correction: 70
Sand equivalent after temperature correction: 70
General comments (publicly viewable) (Max 1000 characters): Import: recycled AB

Test was verified on 9/17/2025