Summary for Test 2025-09-12-28-2
Test performed: CTM 204-June 2010Project Information
| Project Identifiers | Project ID: 1000682 DEA: 09379104 EFIS: 0919000005 |
|---|---|
| DIST-CO-RTE-PM | 09-INY-395-91.6/100.8 |
| Award Date | 02/20/2025 |
| Closeout Date | Not set |
| Work Description | CONSTRUCT HMA, CURB RAMPS, AND ELECTRICAL SYSTEMS. |
| Location Description | INYO COUNTY AT AND NEAR BIG PINE FROM 0.1 MILE SOUTH OF ELNA ROAD TO SOUTH JUNCTION ROUTE 168 |
| QA Service Level | 1 (Verified on 01/13/2025) |
Sample Information
| Sample Taken Date | 09/12/2025 | Sample Unique Key | 28 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/12/2025 |
| Sample type | Acceptance | A brief description of the sample | Imported Borrow |
| The quantity of what the sample constitutes | 2000 Tons | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Colton | Last name of sampler or witnessed by | Carrington |
| Title of sampler | TET | Telephone number of sampler | |
| Laboratory sample identification | IB-01 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | RHB Hwy 6 PIT | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 00-00-0000 |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
| The plant number | A detailed description of where the material sample was collected | Stockpile on Job Site | |
| Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 3/8 inch | |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2025-09-12-28
DIME Test ID: 2025-09-12-28-2
Testing Lab: CT D09 - Bishop Field Laboratory
Test Method: CTM 204-June 2010: Method of Test for Liquid Limit, Plastic Limit and Plasticity Index of Soils (Plasticity Index)
Test Release Date: 2025-09-17
Test Results
The test method used?: Plastic Index
Input Type: Measured
Tester's full name: Derek Carrington
Date of test: 09/15/2025
Liquid Limit (LL): 16 %
Plastic Limit (PL): 15 %
Plastic Index(PI): 1
General comments (publicly viewable) (Max 1000 characters): IB-01
Test was verified on 9/17/2025 ✔
