Summary for Test 2025-09-05-50-2

Test performed: AASHTO T240-23

Project Information

Project IdentifiersProject ID: 1000611
DEA: 120R32U4
EFIS: 1222000054
DIST-CO-RTE-PM12-ORA-55-0.2/R17.8
Award Date02/07/2025
Closeout DateNot set
Work DescriptionCOLD PLANE, PLACE RHMA, REPLACE CB, SIGNS AND MODIFY LIGHTING SYSTEM.
Location DescriptionORANGE COUNTY FROM 0.1 MILE SOUTH OF ROUTE 55/1 SEPARATION IN NEWPORT BEACH TO ROUTE 55/91 SEPARATION IN ANAHEIM
QA Service Level1 (Verified on 09/30/2024)

Sample Information

Sample Taken Date09/05/2025 Sample Unique Key50
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing09/11/2025
Sample typeVerification A brief description of the sampleJMF verification sample
The quantity of what the sample constitutes1can From where was the sample collectedSource
First name of sampler or witnessed byDrake Last name of sampler or witnessed byGustafsun
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameRJ Noble Orange Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeAsphalt Binder Performance GradePG 64-16
Modified Lot number
Sublot number Tank number
Time of sample HMA Supplier
Certified Asphalt SupplierLunday Thagard Company-World Oil - South Gate CA MultigradeNo
Multigrade Type Asphalt Binder Mix Number

Test Details

DIME Sample ID: 2025-09-05-50
DIME Test ID: 2025-09-05-50-2
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T240-23: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2025-09-19

Test Results


Is mass change based on one or two containers?: Two
Is mass change correction factor needed?: Yes
Input Type: Measured
Tester's full name: Angelito Villegas
Date of test: 09/15/2025
Any material loss from containers during heating process/testing?: No
Mass of container #1 before test (m1i): 204.079 grams
Mass of container #2 before test (m2i): 206.549 grams
Mass of container #1 after test (m1f): 204.081 grams
Mass of container #2 after test (m2f): 206.552 grams
Mass of empty container #1: 168.838 grams
Mass of empty container #2: 171.536 grams
Mass correction factor: 0.006
Average mass change: 0.013 percent
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 9/19/2025