Summary for Test 2025-09-09-53-1

Test performed: CTM 216-June 2011

Project Information

Project IdentifiersProject ID: 995225
DEA: 040Q2104
EFIS: 0418000051
DIST-CO-RTE-PM04-CC-80-0.2/10.7
Award Date09/04/2024
Closeout DateNot set
Work DescriptionINSTALL GROSS SOLIDS REMOVAL DEVICES AND TRASH NETS.
Location DescriptionCONTRA COSTA COUNTY AT VARIOUS LOCATIONS FROM CENTRAL AVENUE UNDERCROSSING TO WILLOW AVENUE UNDERCROSSING
QA Service Level1 (Verified on 11/06/2023)

Sample Information

Sample Taken Date09/09/2025 Sample Unique Key53
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing09/09/2025
Sample typeQuality Assurance A brief description of the sampleRecycle Class 2 Aggregate Base
The quantity of what the sample constitutes2 cilinders From where was the sample collectedJob Site
First name of sampler or witnessed byIGNACIO Last name of sampler or witnessed byARECHIGA
Title of samplerLab Technician Telephone number of sampler5102077252
Laboratory sample identificationRich_25_422 Linked DIME Sample ID
The fabricator/manufacturer/facility nameCounty Asphalt Martinez Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-07-0003
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedRichmond Parkway LOC # 15A
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size3/4 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2025-09-09-53
DIME Test ID: 2025-09-09-53-1
Testing Lab: CT D04 - Richmond Field Laboratory
Test Method: CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates
Test Release Date: 2025-09-15

Test Results


Is oversize material: No
Input Type: Calculated
Tester's full name: IGNACIO ARECHIGA
Date of test: 09/09/2025
In-place wet density: 2.21
Highest adjust wet density: 2.21
% Moisture: 11.0 %
Optimum Moisture: 15.0 %
Relative compaction: 100
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 9/15/2025