Summary for Test 2025-07-30-75-1

Test performed: CTM 231-March 2013

Project Information

Project IdentifiersProject ID: 215220
DEA: 07210624
EFIS: 0719000068
DIST-CO-RTE-PM07-LA,SBD-71-1.8/R4.7&R0.0/R0.2
Award Date02/05/2021
Closeout DateNot set
Work DescriptionPLACE STRUCTURE CONCRETE RETAINING WALLS & BOX CULVERT AND PLACE JPCP.
Location DescriptionIN LOS ANGELES AND SAN BERNARDINO COUNTIES IN POMONA AND CHINO HILLS FROM 0.2 MILE SOUTH OF MISSION BOULEVARD OVERCROSSING TO 0.2 MILE OF SAN BERNARDINO COUNTY LINE.
QA Service Level1 (Verified on 03/24/2021)

Sample Information

Sample Taken Date07/30/2025 Sample Unique Key75
Date that the sample was received by the laboratory/organization performing the testing07/30/2025 Sample typeQuality Assurance
A brief description of the sampleSubgrade Native The quantity of what the sample constitutes2,000 SY
From where was the sample collectedJob Site First name of sampler or witnessed byRigoberto
Last name of sampler or witnessed byArroyo Title of samplerMaterials Tester
Telephone number of sampler7605743880 Laboratory sample identification25-2516
Linked DIME Sample ID The fabricator/manufacturer/facility nameN/A
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure nameSB R1 Lane
Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)N/A
The fabricator's/manufacturer's product name for the sampleSubgrade Native The fabricator/manufacturer designation for the sampleCompaction Testing
The plant number A detailed description of where the material sample was collectedJobsite
Where the material sample would have been placed if not sampledJobsite Primary Aggregate Nominal Size3/4 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2025-07-30-75
DIME Test ID: 2025-07-30-75-1
Testing Lab: Alta Vista Solutions - Whittier
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2025-09-12

Test Results


Method Type:: Direct Read
Number of Tests:: 5
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Rigoberto Arroyo
Date of test: 07/30/2025
Gage No.: 86217
Test No.: 3
Nuclear By: Rigoberto
Non-Bias Plan No.: 1
Depth: 12"
Material No.: Subgrade
Material Type: Native
Impact By: Rigoberto Arroyo
Standard Count Density: 2413 g/cc
Count or Density 1: 394 g/cc
Count or Density 2: 429 g/cc
Count or Density 3: 532 g/cc
Count or Density 4: 414 g/cc
Count or Density 5: 473 g/cc
Standard Count Moisture: 771 g/cc
Moisture Count 1: 95 g/cc
Moisture Count 2: 102 g/cc
Moisture Count 3: 149 g/cc
Moisture Count 4: 196 g/cc
Moisture Count 5: 177 g/cc
Sum of Count or Density: 2242 g/cc
Average of Count or Density: 448.4 g/cc
Sum of Moisture Count: 719 g/cc
Average of Moisture Count: 143.8 g/cc
Calculated Percent Relative Compaction: 95 %
Reported Percent Relative Compaction: 95 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 9/12/2025 ✔