Summary for Test 2025-07-29-75-7
Test performed: AASHTO T240-23Project Information
| Project Identifiers | Project ID: 995524 DEA: 021H3604 EFIS: 0216000040 |
|---|---|
| DIST-CO-RTE-PM | 02-SIS-96-76.8/78.0 |
| Award Date | 03/22/2024 |
| Closeout Date | Not set |
| Work Description | REPLACE BRIDGE. |
| Location Description | SISKIYOU COUNTY NEAR HORSE CREEK FROM 0.4 MILE WEST OF KLAMATH RIVER BRIDGE TO 2.0 MILES WEST OF KOHL CREEK |
| QA Service Level | 1 (Verified on 12/27/2023) |
Sample Information
| Sample Taken Date | 07/29/2025 | Sample Unique Key | 75 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/13/2025 |
| Sample type | Quality Assurance | A brief description of the sample | PG 58-34 non-modified |
| The quantity of what the sample constitutes | 2 cans | From where was the sample collected | Source |
| First name of sampler or witnessed by | G | Last name of sampler or witnessed by | Giuntoli |
| Title of sampler | Consultant | Telephone number of sampler | |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Tullis Inc. - Northstate Asphalt (Redding CA) | Transportation Laboratory (TL) Number | 823569 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 58-34 |
|---|---|---|---|
| Modified | No | Lot number | |
| Sublot number | Tank number | ||
| Time of sample | HMA Supplier | Tullis Inc | |
| Certified Asphalt Supplier | Valero Marketing & Supply - Benicia CA | Multigrade | No |
| Multigrade Type | Asphalt Binder Mix Number |
Test Details
DIME Sample ID: 2025-07-29-75
DIME Test ID: 2025-07-29-75-7
Testing Lab: Atlas - Denver
Test Method: AASHTO T240-23: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2025-09-05
Test Results
Is mass change based on one or two containers?: Two
Is mass change correction factor needed?: Yes
Input Type: Measured
Tester's full name: Atlas
Date of test: 08/27/2025
Any material loss from containers during heating process/testing?: No
Mass of container #1 before test (m1i): 211.212 grams
Mass of container #2 before test (m2i): 211.536 grams
Mass of container #1 after test (m1f): 211.028 grams
Mass of container #2 after test (m2f): 211.362 grams
Mass of empty container #1: 176.390 grams
Mass of empty container #2: 176.581 grams
Mass correction factor: 0.030
Average mass change: -0.483 percent
General comments (publicly viewable) (Max 1000 characters): MASS CHANGE
Test was verified on 9/5/2025 ✔
