Summary for Test 2025-08-14-84-2
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 995538 DEA: 024H0604 EFIS: 0218000073 |
|---|---|
| DIST-CO-RTE-PM | 02-PLU,PLU-36- |
| Award Date | 11/05/2024 |
| Closeout Date | Not set |
| Work Description | CHESTER CAUSEWAY REHAB |
| Location Description | LASSEN AND PLUMAS COUNTIES FROM MELISSA AVENUE TO 0.6 MILE EAST OF RED RIVER CANAL |
| QA Service Level | 1 (Verified on 10/24/2024) |
Sample Information
| Sample Taken Date | 08/14/2025 | Sample Unique Key | 84 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 08/19/2025 | Sample type | Acceptance |
| A brief description of the sample | 1/2-inch HMA-A w/25% RAP PG58-22 Albina | The quantity of what the sample constitutes | 1 Pan |
| From where was the sample collected | Manufacturer | First name of sampler or witnessed by | Joe |
| Last name of sampler or witnessed by | Delgado | Title of sampler | Consultant |
| Telephone number of sampler | Laboratory sample identification | D80005 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Hat Creek Construction and Materials - Ward Lake Plant (Litchfield, CA) | |
| Transportation Laboratory (TL) Number | 875610 | Inspector Lot Number from the Transportation Laboratory (TL) Form | |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 1/2 inch | Lot number | |
| Sublot number | HMA Mix Number | ||
| Binder content (%) | 6.2 | Virgin binder PG | PG 58-22 |
| Design binder PG | PG 64-16 | Binder Supplier | Albina (Klamath Falls, OR) |
| RAP content (%) | 25 | WMA Additives | No |
| Antistrip type | Lime |
Test Details
DIME Sample ID: 2025-08-14-84
DIME Test ID: 2025-08-14-84-2
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2025-08-26
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Sean McWithey
Date of test: 08/20/2025
Test procedure used?: Method A
Mass of the specimen basket assembly: 3027.7 g
Mass of the specimen and specimen basket assembly prior to ignition: 4799.5 g
Mass of HMA Sample prior to ignition: 1771.8 g
Mass Loss: 124.0 g
Mass of aggregate remaining after ignition: 1647.8 g
Correction Factor (Percent by mass of HMA Specimen): 0.87 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.17 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 5.96 %
General comments (publicly viewable) (Max 1000 characters): Pb=5.96%, TV=6.20%
Test was verified on 8/26/2025 ✔
