Summary for Test 2025-08-23-5-2
Test performed: CTM 216-June 2011Project Information
| Project Identifiers | Project ID: 995228 DEA: 07347904 EFIS: 0718000123 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-405-31.2/41.4 |
| Award Date | 03/07/2025 |
| Closeout Date | Not set |
| Work Description | COLD PLANE, PLACE HMA, RHMA, JPCP, ISR, & REPLACE BRIDGE SLABS. |
| Location Description | LOS ANGELES FROM WILSHIRE BOULEVARD UNDERCROSSING TO VICTORY BOULEVARD UNDERCROSSING |
| QA Service Level | 1 (Verified on 01/22/2024) |
Sample Information
| Sample Taken Date | 08/23/2025 | Sample Unique Key | 5 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/23/2025 |
| Sample type | Acceptance | A brief description of the sample | Structural Backfill |
| The quantity of what the sample constitutes | 720 SF | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Michelangelo | Last name of sampler or witnessed by | Sese |
| Title of sampler | TET | Telephone number of sampler | 310-345-6204 |
| Laboratory sample identification | 25-2829 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | NA | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | Structural Backfill |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | Various locations | |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2025-08-23-5
DIME Test ID: 2025-08-23-5-2
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates
Test Release Date: 2025-08-23
Test Results
Is oversize material: No
Input Type: Measured
Tester's full name: Michelangelo Sese
Date of test: 08/23/2025
In-place wet density: 2.04
Highest adjust wet density: 2.15
% Moisture: 9.5 %
Optimum Moisture: no data
Relative compaction: 95
General comments (publicly viewable) (Max 1000 characters): NB Rte 405 Line #2 & 3
@ Constitution Ave Approach Slab Lift #3
Test was verified on 8/23/2025 ✔