Summary for Test 2025-07-22-61-7
Test performed: AASHTO T240-23Project Information
| Project Identifiers | Project ID: 215734 DEA: 024H0104 EFIS: 0218000068 |
|---|---|
| DIST-CO-RTE-PM | 02-PLU-70-78.3/90.3 |
| Award Date | 01/29/2025 |
| Closeout Date | Not set |
| Work Description | REPLACE AC SURFACING, PLACE HMA AND THERMOPLASTIC TRAFFIC STRIPING. |
| Location Description | PLUMAS COUNTY NEAR PORTOLA FROM 0.4 MILE WEST OF BIG GRIZZLY CREEK BRIDGE TO 0.8 MILE WEST OF SUMMIT SCHOOL DRIVE |
| QA Service Level | 1 (Verified on 07/08/2021) |
Sample Information
| Sample Taken Date | 07/22/2025 | Sample Unique Key | 61 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 07/31/2025 | Sample type | Quality Assurance |
| A brief description of the sample | Asphalt Binder PG58-22 | The quantity of what the sample constitutes | 2 cans |
| From where was the sample collected | Source | First name of sampler or witnessed by | R |
| Last name of sampler or witnessed by | Melvin | Title of sampler | Consultant |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Albina | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | 815573 | |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 58-22 |
|---|---|---|---|
| Modified | No | Lot number | |
| Sublot number | Tank number | ||
| Time of sample | HMA Supplier | Hat Creek | |
| Certified Asphalt Supplier | Albina Asphalt - Chowchilla CA | Multigrade | No |
| Multigrade Type | PG 58-22 / PG 58-16 | Asphalt Binder Mix Number | |
| HMA Type | Not set | HMA Supplier Mix ID Number | Not set |
Test Details
DIME Sample ID: 2025-07-22-61
DIME Test ID: 2025-07-22-61-7
Testing Lab: Atlas - Denver
Test Method: AASHTO T240-23: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2025-08-20
Test Results
Is mass change based on one or two containers?: Two
Is mass change correction factor needed?: Yes
Input Type: Measured
Tester's full name: Atlas
Date of test: 08/14/2025
Any material loss from containers during heating process/testing?: No
Mass of container #1 before test (m1i): 205.187 grams
Mass of container #2 before test (m2i): 204.471 grams
Mass of container #1 after test (m1f): 204.997 grams
Mass of container #2 after test (m2f): 204.268 grams
Mass of empty container #1: 170.563 grams
Mass of empty container #2: 169.533 grams
Mass correction factor: 0.030
Average mass change: -0.535 percent
General comments (publicly viewable) (Max 1000 characters): mass change
Test was verified on 8/20/2025 ✔
