Summary for Test 2025-07-22-61-9
Test performed: AASHTO T313-22Project Information
| Project Identifiers | Project ID: 215734 DEA: 024H0104 EFIS: 0218000068 |
|---|---|
| DIST-CO-RTE-PM | 02-PLU-70-78.3/90.3 |
| Award Date | 01/29/2025 |
| Closeout Date | Not set |
| Work Description | REPLACE AC SURFACING, PLACE HMA AND THERMOPLASTIC TRAFFIC STRIPING. |
| Location Description | PLUMAS COUNTY NEAR PORTOLA FROM 0.4 MILE WEST OF BIG GRIZZLY CREEK BRIDGE TO 0.8 MILE WEST OF SUMMIT SCHOOL DRIVE |
| QA Service Level | 1 (Verified on 07/08/2021) |
Sample Information
| Sample Taken Date | 07/22/2025 | Sample Unique Key | 61 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 07/31/2025 | Sample type | Quality Assurance |
| A brief description of the sample | Asphalt Binder PG58-22 | The quantity of what the sample constitutes | 2 cans |
| From where was the sample collected | Source | First name of sampler or witnessed by | R |
| Last name of sampler or witnessed by | Melvin | Title of sampler | Consultant |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Albina | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | 815573 | |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 58-22 |
|---|---|---|---|
| Modified | No | Lot number | |
| Sublot number | Tank number | ||
| Time of sample | HMA Supplier | Hat Creek | |
| Certified Asphalt Supplier | Albina Asphalt - Chowchilla CA | Multigrade | No |
| Multigrade Type | PG 58-22 / PG 58-16 | Asphalt Binder Mix Number | |
| HMA Type | Not set | HMA Supplier Mix ID Number | Not set |
Test Details
DIME Sample ID: 2025-07-22-61
DIME Test ID: 2025-07-22-61-9
Testing Lab: Atlas - Denver
Test Method: AASHTO T313-22: Standard Method of Test for Determining the Flexural Creep Stiffness of Asphalt Binder Using the Bending Beam Rheometer (BBR)
Test Release Date: 2025-08-20
Test Results
Input Type: Measured
Tester's full name: Atlas
Date of test: 08/13/2025
Minimum test bath temperature at 240 s: -12.1 C
Maximum test bath temperature at 240 s: -11.9 C
Time of test load application: no data
File name of test data: no data
Time beam in bath: no data
Time test started: no data
Flags issued by software during test: no data
Correlation coefficient (R²): 0
Regression coefficient a: no data
Regression coefficient b: no data
Regression coefficient c: no data
Load at time 0.0: 0.0 mN
Deflection at time 0.0 s: 0.000 µm
Load at time 0.5 s: 0.0 mN
Deflection at time 0.5 s: 0.000 µm
Load at 60.0 s: 0.0 mN
Beam deflection 60.0 s: 0.000 µm
Measured Stiffness Modulus 60.0 s: no data
Estimated Stiffness Modulus 60.0 s: 134.500 MPa
Difference between stiffness moduli 60.0 s: no data
Estimated m-value 60.0 s: 0.332
General comments (publicly viewable) (Max 1000 characters): BBR
Test was verified on 8/20/2025 ✔
