Summary for Test 2025-07-14-115-4
Test performed: AASHTO T240-23Project Information
| Project Identifiers | Project ID: 1000824 DEA: 021K0204 EFIS: 0224000043 |
|---|---|
| DIST-CO-RTE-PM | 02-TRI-299-53.5/61.0 |
| Award Date | 02/05/2025 |
| Closeout Date | 11/25/2025 |
| Work Description | PLACE AR CHIP SEAL AND REPLACE ASPHALT CONCRETE SURFACING. |
| Location Description | TRINITY COUNTY IN AND NEAR WEAVERVILLE AND AT AND NEAR DOUGLAS CITY FROM 0.1 MILE WEST OF INDUSTRIAL PARKWAY TO STEEL BRIDGE ROAD |
| QA Service Level | 1 (Verified on 12/04/2024) |
Sample Information
| Sample Taken Date | 07/14/2025 | Sample Unique Key | 115 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/21/2025 |
| Sample type | Quality Assurance | A brief description of the sample | PG 58-22 |
| The quantity of what the sample constitutes | 2 cans of 58-22 binder | From where was the sample collected | Source |
| First name of sampler or witnessed by | j | Last name of sampler or witnessed by | stergis |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Valero - Benicia, CA | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | C858524 | Structure unique identifier | |
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 58-22 |
|---|---|---|---|
| Modified | No | Lot number | |
| Sublot number | Tank number | ||
| Time of sample | HMA Supplier | ||
| Certified Asphalt Supplier | Valero Marketing & Supply - Benicia CA | Multigrade | No |
| Multigrade Type | Asphalt Binder Mix Number |
Test Details
DIME Sample ID: 2025-07-14-115
DIME Test ID: 2025-07-14-115-4
Testing Lab: Atlas - Denver
Test Method: AASHTO T240-23: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2025-08-18
Test Results
Is mass change based on one or two containers?: Two
Is mass change correction factor needed?: Yes
Input Type: Measured
Tester's full name: Atlas
Date of test: 08/13/2025
Any material loss from containers during heating process/testing?: No
Mass of container #1 before test (m1i): 206.723 grams
Mass of container #2 before test (m2i): 211.204 grams
Mass of container #1 after test (m1f): 206.557 grams
Mass of container #2 after test (m2f): 211.038 grams
Mass of empty container #1: 171.458 grams
Mass of empty container #2: 176.419 grams
Mass correction factor: 0.030
Average mass change: -0.444 percent
General comments (publicly viewable) (Max 1000 characters): Mass Change
Test was verified on 8/18/2025 ✔
