Summary for Test 2025-07-16-108-1

Test performed: CTM 231-March 2013

Project Information

Project IdentifiersProject ID: 1001169
DEA: 07314524
EFIS: 0722000300
COOP: 075283
DIST-CO-RTE-PM07---
Award Date07/03/2023
Closeout DateNot set
Work DescriptionI-105 METRO Express Lanes Project
Location DescriptionLA-105 PM R0.6/R10.1, LA-110 PM R14.1/R16.6
QA Service Level2 (Verified on 04/11/2025)

Sample Information

Sample Taken Date07/16/2025 Sample Unique Key108
Date that the sample was received by the laboratory/organization performing the testing07/16/2025 Sample typeQuality Assurance
A brief description of the sampleSubgrade The quantity of what the sample constitutes40 SY
From where was the sample collectedJob Site First name of sampler or witnessed byCarlos
Last name of sampler or witnessed byViramnotes Title of samplerMaterials Tester
Telephone number of sampler5628377377 Laboratory sample identification25-0716
Linked DIME Sample ID The fabricator/manufacturer/facility nameN/A
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure nameAbutment 1 Avalon
Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)N/A
The fabricator's/manufacturer's product name for the sampleSubgrade The fabricator/manufacturer designation for the sampleCompaction testing
The plant number A detailed description of where the material sample was collectedJobsite
Where the material sample would have been placed if not sampledJobsite Primary Aggregate Nominal Size3/4 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2025-07-16-108
DIME Test ID: 2025-07-16-108-1
Testing Lab: Alta Vista Solutions - Whittier
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2025-08-15

Test Results


Method Type:: Direct Read
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Carlos Viramontes
Date of test: 07/16/2025
Gage No.: 25577
Test No.: 1
Nuclear By: Carlos Viramontes
Non-Bias Plan No.: 3
Depth: 12"
Material No.: Native
Material Type: Subgrade
Impact By: Carlos Viramontes
Standard Count Density: 1124 g/cc
Count or Density 1: 328 g/cc
Count or Density 2: 354 g/cc
Count or Density 3: 356 g/cc
Standard Count Moisture: 623 g/cc
Moisture Count 1: 120 g/cc
Moisture Count 2: 178 g/cc
Moisture Count 3: 149 g/cc
Sum of Count or Density: 1038 g/cc
Average of Count or Density: 346 g/cc
Sum of Moisture Count: 447 g/cc
Average of Moisture Count: 149 g/cc
Calculated Percent Relative Compaction: 84.7 %
Reported Percent Relative Compaction: 85 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 8/15/2025 ✔