Summary for Test 2025-07-08-78-1

Test performed: CTM 231-March 2013

Project Information

Project IdentifiersProject ID: 1001169
DEA: 07314524
EFIS: 0722000300
COOP: 075283
DIST-CO-RTE-PM07---
Award Date07/03/2023
Closeout DateNot set
Work DescriptionI-105 METRO Express Lanes Project
Location DescriptionLA-105 PM R0.6/R10.1, LA-110 PM R14.1/R16.6
QA Service Level2 (Verified on 04/11/2025)

Sample Information

Sample Taken Date07/08/2025 Sample Unique Key78
Date that the sample was received by the laboratory/organization performing the testing07/08/2025 Sample typeQuality Assurance
A brief description of the sampleNative The quantity of what the sample constitutes37 SY
From where was the sample collectedJob Site First name of sampler or witnessed byFernando
Last name of sampler or witnessed byCarranza Title of samplerMaterials Tester
Telephone number of sampler2132384209 Laboratory sample identification25-0708
Linked DIME Sample ID The fabricator/manufacturer/facility nameN/A
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure nameWB 105 Abutment 2 Left Stanford
Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)N/A
The fabricator's/manufacturer's product name for the sampleNative The fabricator/manufacturer designation for the sampleCompactions Testing
The plant number A detailed description of where the material sample was collectedJobsite
Where the material sample would have been placed if not sampledJobsite Primary Aggregate Nominal Size3/4 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2025-07-08-78
DIME Test ID: 2025-07-08-78-1
Testing Lab: Alta Vista Solutions - Whittier
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2025-08-14

Test Results


Method Type:: Direct Read
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Fernando Carranza
Date of test: 07/08/2025
Gage No.: 67731
Test No.: 2
Nuclear By: Fernando Carranza
Non-Bias Plan No.: 3
Depth: 6"
Material No.: Structural Backfill
Material Type: Native
Impact By: Fernando Carranza
Standard Count Density: 1838 g/cc
Count or Density 1: 1856 g/cc
Count or Density 2: 1911 g/cc
Count or Density 3: 1868 g/cc
Standard Count Moisture: 613 g/cc
Moisture Count 1: 129 g/cc
Moisture Count 2: 136 g/cc
Moisture Count 3: 142 g/cc
Sum of Count or Density: 5635 g/cc
Average of Count or Density: 1878.33 g/cc
Sum of Moisture Count: 407 g/cc
Average of Moisture Count: 135.67 g/cc
Calculated Percent Relative Compaction: 98.1 %
Reported Percent Relative Compaction: 98 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 8/14/2025 ✔