Summary for Test 2025-08-14-7-1
Test performed: CTM 231-March 2013Project Information
| Project Identifiers | Project ID: 1000802 DEA: 07346804 EFIS: 0718000079 |
|---|---|
| DIST-CO-RTE-PM | 07-VEN-232-0.4/R4.1 |
| Award Date | 02/04/2025 |
| Closeout Date | Not set |
| Work Description | COLD PLANE AND OVERLAY WITH HMA & RHMA. |
| Location Description | VENTURA COUNTY IN AND NEAR OXNARD FROM ROUTE 232/101 SEPARATION TO ROUTE 118 |
| QA Service Level | 1 (Verified on 01/27/2025) |
Sample Information
| Sample Taken Date | 08/14/2025 | Sample Unique Key | 7 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/14/2025 |
| Sample type | Acceptance | A brief description of the sample | Aggregate Base |
| The quantity of what the sample constitutes | 1092 SF | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Michelangelo | Last name of sampler or witnessed by | Sese |
| Title of sampler | TET | Telephone number of sampler | 310-345-6204 |
| Laboratory sample identification | 25-2724 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | NA | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | Aggregate Base |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | Various locations | |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2025-08-14-7
DIME Test ID: 2025-08-14-7-1
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2025-08-14
Test Results
Method Type:: Direct Read
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Michelangelo Sese
Date of test: 08/14/2025
Gage No.: 31106
Test No.: no data
Nuclear By: Michelangelo Sese
Non-Bias Plan No.: 2
Depth: 3
Material No.: no data
Material Type: Aggregate Base
Impact By: Michelangelo Sese
Standard Count Density: 2110 g/cc
Count or Density 1: 2 g/cc
Count or Density 2: 1.96 g/cc
Count or Density 3: 1.94 g/cc
Standard Count Moisture: 620 g/cc
Moisture Count 1: 0.22 g/cc
Moisture Count 2: 0.18 g/cc
Moisture Count 3: 0.2 g/cc
Sum of Count or Density: 5.9 g/cc
Average of Count or Density: 1.97 g/cc
Sum of Moisture Count: 0.6 g/cc
Average of Moisture Count: 0.2 g/cc
Calculated Percent Relative Compaction: 95.5 %
Reported Percent Relative Compaction: 95 %
General comments (publicly viewable) (Max 1000 characters): EB VEN Rte. 232
NW corner of Montgomery Ave
Curb Ramp #C-20 "Sidewalk"
Test was verified on 8/14/2025 ✔
