Summary for Test 2025-05-09-87-2
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 994226 DEA: 042K7004 EFIS: 0417000010 COOP: 042895 |
|---|---|
| DIST-CO-RTE-PM | 04-ALA-880-R0.0/11.8 |
| Award Date | 07/13/2023 |
| Closeout Date | Not set |
| Work Description | Cold plane pavement and overlay with RHMA-G/RHMA-O (CAPITAL PREVENTIVE MAINTENANCE) |
| Location Description | ALAMEDA COUNTY IN FREMONT AND NEWARK FROM SANTA CLARA COUNTY LINE TO 0.4 MILE NORTH OF FREMONT BOULEVARD OVERCROSSING |
| QA Service Level | 1 (Verified on 09/13/2022) |
Sample Information
| Sample Taken Date | 05/09/2025 | Sample Unique Key | 87 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 05/12/2025 | Sample type | Quality Assurance |
| A brief description of the sample | 1/2" RHMA-O WMA | The quantity of what the sample constitutes | 1 - 750 tons |
| From where was the sample collected | Supplier | First name of sampler or witnessed by | Jacob |
| Last name of sampler or witnessed by | Vega | Title of sampler | Consultant QA |
| Telephone number of sampler | Laboratory sample identification | SJ-050925-PSU-T308-A-B | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Vulcan Pleasanton Drier Drum Plant | |
| Transportation Laboratory (TL) Number | SJ-050925-1 | Inspector Lot Number from the Transportation Laboratory (TL) Form | |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | OGFC |
|---|---|---|---|
| HMA Grading | 1/2 inch | Lot number | 3 |
| Sublot number | 1 | HMA Mix Number | 326114W |
| Binder content (%) | 0.0 | Virgin binder PG | |
| Design binder PG | Binder Supplier | ||
| RAP content (%) | Not set | WMA Additives | |
| Antistrip type |
Test Details
DIME Sample ID: 2025-05-09-87
DIME Test ID: 2025-05-09-87-2
Testing Lab: CT D04 - San Jose Construction Field Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2025-08-08
Test Results
What temperature unit is used?: Celsius
Input Type: Calculated
Tester's full name: Jacob Vega
Date of test: 05/16/2025
Test procedure used?: Method A
Mass of HMA Sample prior to ignition: 1639.1 g
Mass Loss: 144.7 g
Correction Factor (Percent by mass of HMA Specimen): 0.85 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.21 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 7.77 %
General comments (publicly viewable) (Max 1000 characters): Lot 3 - Sublot 1 PSU-T308-B
Test was verified on 8/8/2025 ✔
