Summary for Test 2025-06-11-107-3

Test performed: CTM 217-June 2011

Project Information

Project IdentifiersProject ID: 1000402
DEA: 11430384
EFIS: 1118000114
DIST-CO-RTE-PM11-SD-805-23.7/28.5
Award Date10/09/2024
Closeout DateNot set
Work DescriptionREPLACE DRAINAGE, CONCRETE PAVEMENT, AND MODIFY ELECTRICAL SYSTEMS.
Location DescriptionSAN DIEGO COUNTY IN SAN DIEGO FROM 0.1 MILE NORTH OF ROUTE 805/52 SEPARATION TO ROUTE 5/805 SEPARATION
QA Service Level1 (Verified on 11/18/2024)

Sample Information

Sample Taken Date06/11/2025 Sample Unique Key107
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing06/12/2025
Sample typeQuality Control A brief description of the sample1" Rock and Sand
The quantity of what the sample constitutes1 Bag From where was the sample collectedJob Site
First name of sampler or witnessed byJulian Last name of sampler or witnessed byCarmona
Title of samplerQC Field Technician Telephone number of sampler
Laboratory sample identification4HEX4BM Linked DIME Sample ID
The fabricator/manufacturer/facility nameVanguard Construction Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-31-0035
The fabricator's/manufacturer's product name for the sampleSet 1 The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedBelt Cut
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size1 inch
The concrete mix design number4HEX4BM Lot number1
Sublot number1 Aggregate Mix Number

Test Details

DIME Sample ID: 2025-06-11-107
DIME Test ID: 2025-06-11-107-3
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2025-10-17

Test Results


Number of tests: 1
Input Type: Calculated
Tester's full name: Julian Carmona
Date of test: 06/12/2025
Temperature correction: 0
Temperature of solution: 72
Clay reading (test 1): 0
Sand reading (test 1): 0
Sand equivalent (test 1): 94
Sand equivalent before temperature correction: 0
Sand equivalent after temperature correction: 94
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 10/17/2025