Summary for Test 2025-07-03-37-1
Test performed: CTM 231-March 2013Project Information
| Project Identifiers | Project ID: 1000569 DEA: 051J8604 EFIS: 0518000081 |
|---|---|
| DIST-CO-RTE-PM | 05-SLO-101-7.8/16.5 |
| Award Date | 02/12/2025 |
| Closeout Date | Not set |
| Work Description | COLD PLANE AC PAVEMENT, RHMA-G, DRAINAGE SYSTEMS AND BARRIERS. |
| Location Description | SAN LUIS OBISPO COUNTY IN AND NEAR ARROYO GRANDE AND PISMO BEACH FROM LOS BERROS ROAD UNDERCROSSING TO PISMO CREEK BRIDGE |
| QA Service Level | 1 (Verified on 09/09/2024) |
Sample Information
| Sample Taken Date | 07/03/2025 | Sample Unique Key | 37 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/03/2025 |
| Sample type | Quality Assurance | A brief description of the sample | Class 2AB |
| The quantity of what the sample constitutes | Test Area 118'x15' | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Reyli | Last name of sampler or witnessed by | Angeles |
| Title of sampler | JET | Telephone number of sampler | 8057212723 |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Sierra Pacific Materials Templeton | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | jobsite - compacted base | |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2025-07-03-37
DIME Test ID: 2025-07-03-37-1
Testing Lab: CT D05 - Santa Maria Field Laboratory
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2025-08-05
Test Results
Method Type:: Standard Count
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Calculated
Tester's full name: Reyli Angeles-Zayas
Date of test: 07/03/2025
Sum of Count or Density: 5623 g/cc
Average of Count or Density: 1874.33 g/cc
Sum of Moisture Count: 582 g/cc
Average of Moisture Count: 194 g/cc
Count Ratio Density: 2.07
Count Ratio Moisture: 0.22
Calculated Percent Relative Compaction: 92.4 %
Reported Percent Relative Compaction: 92 %
General comments (publicly viewable) (Max 1000 characters): 95% Requirement. South bound Price Street on ramp. CST-13. Re-Test. 870+43-871+61
Test was verified on 8/5/2025 ✔
