Summary for Test 2025-06-27-58-1

Test performed: CTM 231-March 2013
Warning: The test results shown on this page have been superseded and are invalid. This information is for reference only. Please click this link to view the corrected test.

Project Information

Project IdentifiersProject ID: 1000569
DEA: 051J8604
EFIS: 0518000081
DIST-CO-RTE-PM05-SLO-101-7.8/16.5
Award Date02/12/2025
Closeout DateNot set
Work DescriptionCOLD PLANE AC PAVEMENT, RHMA-G, DRAINAGE SYSTEMS AND BARRIERS.
Location DescriptionSAN LUIS OBISPO COUNTY IN AND NEAR ARROYO GRANDE AND PISMO BEACH FROM LOS BERROS ROAD UNDERCROSSING TO PISMO CREEK BRIDGE
QA Service Level1 (Verified on 09/09/2024)

Sample Information

Sample Taken Date06/27/2025 Sample Unique Key58
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing06/27/2025
Sample typeQuality Assurance A brief description of the sampleClass 2AB
The quantity of what the sample constitutesTest Area 174x15' Compacted Class 2 AB From where was the sample collectedJob Site
First name of sampler or witnessed byReyli Last name of sampler or witnessed byAngeles
Title of samplerJET Telephone number of sampler8057212723
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameSierra Pacific Materials Templeton Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sample
The fabricator/manufacturer designation for the sample A detailed description of where the material sample was collectedjobsite - compacted base
Where the material sample would have been placed if not sampled

Test Details

DIME Sample ID: 2025-06-27-58
DIME Test ID: 2025-06-27-58-1
Testing Lab: CT D05 - Santa Maria Field Laboratory
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2025-08-05

Test Results


Method Type:: Standard Count
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Calculated
Tester's full name: Reyli Angeles-Zayas
Date of test: 06/27/2025
Sum of Count or Density: 6160 g/cc
Average of Count or Density: 2053.33 g/cc
Sum of Moisture Count: 454 g/cc
Average of Moisture Count: 151.33 g/cc
Count Ratio Density: 1.22
Count Ratio Moisture: 0.21
Calculated Percent Relative Compaction: 92.1 %
Reported Percent Relative Compaction: 92 %
General comments (publicly viewable) (Max 1000 characters): 95% Requirement. Brisco North bound on ramp gore point. CST-08. 737+90-739+64

Test was verified on 8/5/2025

Warning: The test results shown on this page have been superseded and are invalid. This information is for reference only.