Summary for Test 2025-06-18-137-2
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 66669 DEA: JMF-DATA EFIS: JMF-DATA |
|---|---|
| DIST-CO-RTE-PM | 59--- |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | Special project for storing JMF sample data |
| Location Description | Not set |
| QA Service Level | NOT VERIFIED |
Sample Information
| Sample Taken Date | 06/18/2025 | Sample Unique Key | 137 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/19/2025 |
| Sample type | Verification | A brief description of the sample | 2 bags of Fine RAP |
| The quantity of what the sample constitutes | JMF Verification | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Ward | Last name of sampler or witnessed by | Jenkins |
| Title of sampler | Not set | Telephone number of sampler | Not set |
| Laboratory sample identification | Not set | Linked DIME Sample ID | Not set |
| The fabricator/manufacturer/facility name | Hat Creek Construction & Materials — Shaw Pit Facility (Lookout, CA) | Transportation Laboratory (TL) Number | Not set |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | Not set | |
| Structure name | Not set | Bid Item | Not set |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | Shaw Pit Facility (Lookout, CA) |
|---|---|---|---|
| Aggregate Size | Not set | Aggregate Source | Not set |
| RAP Stockpile | Not set | Stockpile Size (tons) | Not set |
| Reclaimed Asphalt Pavement Mix Number | Not set |
Test Details
DIME Sample ID: 2025-06-18-137
DIME Test ID: 2025-06-18-137-2
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2025-06-24
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Dacota Mei
Date of test: 06/25/2025
Test procedure used?: Method A
Mass of the specimen basket assembly: 3060.5 g
Mass of the specimen and specimen basket assembly prior to ignition: 4700.8 g
Mass of HMA Sample prior to ignition: 1640.3 g
Mass Loss: 101.5 g
Mass of aggregate remaining after ignition: 1538.8 g
Correction Factor (Percent by mass of HMA Specimen): 0.00 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.18 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 6.01 %
General comments (publicly viewable) (Max 1000 characters): Pbr(uncorrected)=6.01%
Test was verified on 6/24/2025 ✔
