Summary for Test 2025-07-21-26-2
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 995538 DEA: 024H0604 EFIS: 0218000073 |
|---|---|
| DIST-CO-RTE-PM | 02-PLU,PLU-36- |
| Award Date | 11/05/2024 |
| Closeout Date | Not set |
| Work Description | CHESTER CAUSEWAY REHAB |
| Location Description | LASSEN AND PLUMAS COUNTIES FROM MELISSA AVENUE TO 0.6 MILE EAST OF RED RIVER CANAL |
| QA Service Level | 1 (Verified on 10/24/2024) |
Sample Information
| Sample Taken Date | 07/21/2025 | Sample Unique Key | 26 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 07/22/2025 | Sample type | Production Start-Up |
| A brief description of the sample | 2 bags Fine RAP | The quantity of what the sample constitutes | Production Start-Up Evaluation |
| From where was the sample collected | Manufacturer | First name of sampler or witnessed by | Joe |
| Last name of sampler or witnessed by | Delgado | Title of sampler | Consultant |
| Telephone number of sampler | Laboratory sample identification | D79964B | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Dig It Construction — Sierra Cascade Aggregate and Asphalt Products (Chester, CA) | |
| Transportation Laboratory (TL) Number | 867341 | Inspector Lot Number from the Transportation Laboratory (TL) Form | |
| Structure unique identifier | Structure name | ||
| Bid Item | 3908274 |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | Sierra Cascade Aggregate and Asphalt Products |
|---|---|---|---|
| Aggregate Size | 3/8-inch | Aggregate Source | |
| RAP Stockpile | Stockpile Size (tons) | ||
| Reclaimed Asphalt Pavement Mix Number |
Test Details
DIME Sample ID: 2025-07-21-26
DIME Test ID: 2025-07-21-26-2
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2026-01-16
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Sean McWithey
Date of test: 07/24/2025
Test procedure used?: Method A
Mass of the specimen basket assembly: 3153.5 g
Mass of the specimen and specimen basket assembly prior to ignition: 4816.2 g
Mass of HMA Sample prior to ignition: 1662.7 g
Mass Loss: 108.2 g
Mass of aggregate remaining after ignition: 1554.5 g
Correction Factor (Percent by mass of HMA Specimen): 0.00 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.18 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 6.33 %
General comments (publicly viewable) (Max 1000 characters): Pbr(uncorrected)=6.33%,
Pbr≈5.67%
Test was verified on 1/16/2026 ✔
