Summary for Test 2025-07-09-88-3
Test performed: ASTM D5329-16Project Information
| Project Identifiers | Project ID: 1001213 DEA: 11431644 EFIS: 1122000232 |
|---|---|
| DIST-CO-RTE-PM | 11-SD-78-N17.7 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | Cold plane, RHMA overlay, Concrete Barriers, Landscape and Electrical. |
| Location Description | IN SAN DIEGO COUNTY FROM ROUTE 78/5 SEPARATION TO 0.3 MILE EAST OF ESCONDIDO BOULEVARD UNDERCROSSING. |
| QA Service Level | 1 (Verified on 05/07/2025) |
Sample Information
| Sample Taken Date | 07/09/2025 | Sample Unique Key | 88 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/28/2025 |
| Sample type | Verification | A brief description of the sample | Asphalt Rubber Binder |
| The quantity of what the sample constitutes | 1can | From where was the sample collected | Source |
| First name of sampler or witnessed by | Martin Marietta QC | Last name of sampler or witnessed by | Vulcan QC |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Martin Mariett(CCA) Lake Elsinore | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Asphalt Rubber Binder | Asphalt modifier supplier | |
|---|---|---|---|
| Performance Grade | PG 64-16 | Lot number | |
| Sublot number | Asphalt Rubber Binder Mix Number |
Test Details
DIME Sample ID: 2025-07-09-88
DIME Test ID: 2025-07-09-88-3
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: ASTM D5329-16: Standard Test Methods for Sealants and Fillers, Hot-Applied, for Joints and Cracks in Asphalt Pavements and Portland Cement Concrete Pavements (Asphalt Pavement)
Test Release Date: 2025-08-01
Test Results
Input Type: Calculated
Tester's full name: Angelito Villegas
Date of test: 07/30/2025
Temperature: 25 C
Ball Penetration (P1): 4 mm
Final Dial reading (F1): 1 mm
Ball Penetration (P2): 2 mm
Final Dial reading (F2): 62 mm
Ball Penetration (P3): 58 mm
Final Dial reading (F3): 59 mm
Resilience 1: 42 %
Resilience 2: 43 %
Resilience 3: 43 %
Average Resilience: 43 %
Minutes Reaction: no data
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 8/1/2025 ✔
