Summary for Test 2025-07-02-19-4

Test performed: SMTL BILST-06

Project Information

Project IdentifiersProject ID: 1000279
DEA: 023H70U4
EFIS: 0223000161
DIST-CO-RTE-PM02-TRI-299-15.0/25.7
Award Date08/09/2024
Closeout Date06/23/2026
Work DescriptionRHMA-G, HMA (TYPE A), COLD PLANE AC, & SOLDIER PILE RETAINING WALL.
Location DescriptionTRINITY COUNTY NEAR DEL LOMA FROM 1.0 MILE EAST OF TRINITY RIVER BRIDGE NO.05-0006 TO 0.1 MILE WEST OF PRAIRIE CREEK ROAD
QA Service Level1 (Verified on 04/30/2024)

Sample Information

Sample Taken Date07/02/2025 Sample Unique Key19
Date that the sample was received by the laboratory/organization performing the testing07/10/2025 Sample typeQuality Assurance
A brief description of the sampleBearing Pad The quantity of what the sample constitutes61
From where was the sample collectedManufacturer First name of sampler or witnessed byNA
Last name of sampler or witnessed byNA Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameDynamic Rubber
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSMTL TM1 - Elastomeric Bearing Pad Mfg. Lot Number(s)CR55-012-D
Material/Compound/Elastomer IDNA Samples Representing61
Description (size)1.15" x 12" x 13" Comments
Description (Number of Shims)2 Type of Bearing PadSteel
Description (Thickness of Shims)14 gage Manufacturer(s)Dynamic Rubber
Batch Number304-KMC

Test Details

DIME Sample ID: 2025-07-02-19
DIME Test ID: 2025-07-02-19-4
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: SMTL BILST-06: (Neoprene Verification) Bilstein Test
Test Release Date: 2025-07-30

Test Results


Input Type: Calculated
Tester's full name: Steven Paine
Date of test: 07/30/2025
Result: Pass
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 7/30/2025 ✔