Summary for Test 2025-07-17-76-2
Test performed: CTM 216-June 2011Project Information
| Project Identifiers | Project ID: 208712 DEA: 07210600 EFIS: 0700020800 COOP: 4886 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-71-0.5-4.5 |
| Award Date | Not set |
| Closeout Date | 06/16/2021 |
| Work Description | Would add one mixed flow and one HOV lane each direction on SR 71. Caltrans and LA Metro Transportation Authority have made a joint determination to cancel procurement of this and other Accelerated Regional Transportation Improvements (ARTI) Projects. |
| Location Description | ON ROUTE 71 FROM ROUTE 10 TO ROUTE 60 INTERCHANGE |
| QA Service Level | 1 (Verified on 06/16/2021) |
Sample Information
| Sample Taken Date | 07/17/2025 | Sample Unique Key | 76 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/17/2025 |
| Sample type | Quality Assurance | A brief description of the sample | Class 3 Aggregate Base |
| The quantity of what the sample constitutes | 1,907 SY | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Kristopher | Last name of sampler or witnessed by | Martinez |
| Title of sampler | Materials Tester | Telephone number of sampler | 213-500-4518 |
| Laboratory sample identification | 25-2305 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | N/A | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | South Bound Between Mission blvd & Rio Ranch exit | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | N/A |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | Class 3 Aggregate Base | The fabricator/manufacturer designation for the sample | Compaction testing |
| The plant number | A detailed description of where the material sample was collected | Jobsite | |
| Where the material sample would have been placed if not sampled | Jobsite | Primary Aggregate Nominal Size | 3/4 inch |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2025-07-17-76
DIME Test ID: 2025-07-17-76-2
Testing Lab: Alta Vista Solutions - Whittier
Test Method: CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates
Test Release Date: 2025-07-30
Test Results
Is oversize material: No
Input Type: Measured
Tester's full name: Kristopher Martinez
Date of test: 07/17/2025
In-place wet density: 2.14
Highest adjust wet density: 2.26
% Moisture: 4.9 %
Optimum Moisture: 6.4 %
Relative compaction: 95
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 7/30/2025 ✔
