Summary for Test 2025-07-17-76-1

Test performed: CTM 231-March 2013

Project Information

Project IdentifiersProject ID: 208712
DEA: 07210600
EFIS: 0700020800
COOP: 4886
DIST-CO-RTE-PM07-LA-71-0.5-4.5
Award DateNot set
Closeout Date06/16/2021
Work DescriptionWould add one mixed flow and one HOV lane each direction on SR 71. Caltrans and LA Metro Transportation Authority have made a joint determination to cancel procurement of this and other Accelerated Regional Transportation Improvements (ARTI) Projects.
Location DescriptionON ROUTE 71 FROM ROUTE 10 TO ROUTE 60 INTERCHANGE
QA Service Level1 (Verified on 06/16/2021)

Sample Information

Sample Taken Date07/17/2025 Sample Unique Key76
Date that the sample was received by the laboratory/organization performing the testing07/17/2025 Sample typeQuality Assurance
A brief description of the sampleClass 3 Aggregate Base The quantity of what the sample constitutes1,907 SY
From where was the sample collectedJob Site First name of sampler or witnessed byKristopher
Last name of sampler or witnessed byMartinez Title of samplerMaterials Tester
Telephone number of sampler213-500-4518 Laboratory sample identification25-2305
Linked DIME Sample ID The fabricator/manufacturer/facility nameN/A
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure nameSouth Bound Between Mission blvd & Rio Ranch exit
Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)N/A
The fabricator's/manufacturer's product name for the sampleClass 3 Aggregate Base The fabricator/manufacturer designation for the sampleCompaction testing
The plant number A detailed description of where the material sample was collectedJobsite
Where the material sample would have been placed if not sampledJobsite Primary Aggregate Nominal Size3/4 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2025-07-17-76
DIME Test ID: 2025-07-17-76-1
Testing Lab: Alta Vista Solutions - Whittier
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2025-07-30

Test Results


Method Type:: Direct Read
Number of Tests:: 5
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Kristopher Martinez
Date of test: 07/17/2025
Gage No.: 67731
Test No.: 1
Nuclear By: Kristopher Martinez
Non-Bias Plan No.: 6
Depth: 7"
Material No.: Class 3 Aggregate Base
Material Type: Class 3 Aggregate Base
Impact By: Kristopher Martinez
Standard Count Density: 1840 g/cc
Count or Density 1: 1288 g/cc
Count or Density 2: 1387 g/cc
Count or Density 3: 1165 g/cc
Count or Density 4: 1374 g/cc
Count or Density 5: 1301 g/cc
Standard Count Moisture: 610 g/cc
Moisture Count 1: 89 g/cc
Moisture Count 2: 66 g/cc
Moisture Count 3: 71 g/cc
Moisture Count 4: 89 g/cc
Moisture Count 5: 103 g/cc
Sum of Count or Density: 6515 g/cc
Average of Count or Density: 1303 g/cc
Sum of Moisture Count: 418 g/cc
Average of Moisture Count: 83.6 g/cc
Calculated Percent Relative Compaction: 94.7 %
Reported Percent Relative Compaction: 95 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 7/30/2025 ✔