Summary for Test 2025-07-22-56-2
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 215734 DEA: 024H0104 EFIS: 0218000068 |
|---|---|
| DIST-CO-RTE-PM | 02-PLU-70-78.3/90.3 |
| Award Date | 01/29/2025 |
| Closeout Date | Not set |
| Work Description | REPLACE AC SURFACING, PLACE HMA AND THERMOPLASTIC TRAFFIC STRIPING. |
| Location Description | PLUMAS COUNTY NEAR PORTOLA FROM 0.4 MILE WEST OF BIG GRIZZLY CREEK BRIDGE TO 0.8 MILE WEST OF SUMMIT SCHOOL DRIVE |
| QA Service Level | 1 (Verified on 07/08/2021) |
Sample Information
| Sample Taken Date | 07/22/2025 | Sample Unique Key | 56 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/23/2025 |
| Sample type | Production Start-Up | A brief description of the sample | 2 bags Fine RAP |
| The quantity of what the sample constitutes | Production Start-Up Evaluation | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Riley | Last name of sampler or witnessed by | Melvin |
| Title of sampler | Consultant | Telephone number of sampler | |
| Laboratory sample identification | D79970B | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Hat Creek Construction and Materials — Ward Lake Plant (Litchfield, CA) | Transportation Laboratory (TL) Number | 815571 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | 3923700 |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | Ward Lake Plant |
|---|---|---|---|
| Aggregate Size | 3/8-inch | Aggregate Source | |
| RAP Stockpile | Stockpile Size (tons) | ||
| Reclaimed Asphalt Pavement Mix Number |
Test Details
DIME Sample ID: 2025-07-22-56
DIME Test ID: 2025-07-22-56-2
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2025-07-30
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Dacota Mei
Date of test: 07/29/2025
Test procedure used?: Method A
Mass of the specimen basket assembly: 3017.5 g
Mass of the specimen and specimen basket assembly prior to ignition: 4647.3 g
Mass of HMA Sample prior to ignition: 1629.8 g
Mass Loss: 106.6 g
Mass of aggregate remaining after ignition: 1523.2 g
Correction Factor (Percent by mass of HMA Specimen): 0.00 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.18 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 6.36 %
General comments (publicly viewable) (Max 1000 characters): Pb(uncorrected)=6.36%
Test was verified on 7/30/2025 ✔
