Summary for Test 2025-07-08-64-2
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 995229 DEA: 07355404 EFIS: 0719000010 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-2,210-15.0/57.5,R18.7/R19.4 |
| Award Date | 01/30/2024 |
| Closeout Date | Not set |
| Work Description | REPLACE AND INSTALL DRAINAGE SYSTEM, AND PERFORM SLOPE PAVING. |
| Location Description | LOS ANGELES COUNTY ON ROUTE 2 FROM 1.0 MILE NORTH OF CLIFFORD STREET TO MOUNT WATERMAN SKI LIFTS AND ON ROUTE 210 FROM 0.5 MILE EAST OF OCEAN VIEW BOULVEARD OVERCROSSING TO 0.2 MILE EAST OF ALTA CANYADA ROAD OVERCROSSING |
| QA Service Level | 1 (Verified on 10/19/2023) |
Sample Information
| Sample Taken Date | 07/08/2025 | Sample Unique Key | 64 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/08/2025 |
| Sample type | Acceptance | A brief description of the sample | 3/4" HMA-A |
| The quantity of what the sample constitutes | 750 Tons | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Baher | Last name of sampler or witnessed by | Fakhoury |
| Title of sampler | TET | Telephone number of sampler | |
| Laboratory sample identification | 25-443 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | AAA Irwindale | Transportation Laboratory (TL) Number | 003826 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 3/4 inch | Lot number | |
| Sublot number | HMA Mix Number | 103819 | |
| Binder content (%) | 4.8 | Virgin binder PG | |
| Design binder PG | Binder Supplier | San Juaquin Refinery | |
| RAP content (%) | Not set | WMA Additives | |
| Antistrip type |
Test Details
DIME Sample ID: 2025-07-08-64
DIME Test ID: 2025-07-08-64-2
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2025-07-29
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Daniel Gomez
Date of test: 07/28/2025
Test procedure used?: Method A
Mass of the specimen basket assembly: 4057.4 g
Mass of the specimen and specimen basket assembly prior to ignition: 6117.1 g
Mass of HMA Sample prior to ignition: 2059.7 g
Mass Loss: 97.6 g
Mass of aggregate remaining after ignition: 1962.1 g
Correction Factor (Percent by mass of HMA Specimen): 0.19 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.00 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 4.55 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 7/29/2025 ✔