Summary for Test 2025-07-21-29-3
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 1000225 DEA: 023J3204 EFIS: 0222000034 |
|---|---|
| DIST-CO-RTE-PM | 02-TRI-3,36,299-Var |
| Award Date | 06/06/2024 |
| Closeout Date | Not set |
| Work Description | BRIDGE POLYESTER CONCRETE OVERLAY & METHACRYLATE DECK SEAL. |
| Location Description | TRINITY COUNTY AT VARIOUS LOCATIONS |
| QA Service Level | 1 (Verified on 04/08/2024) |
Sample Information
| Sample Taken Date | 07/21/2025 | Sample Unique Key | 29 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/22/2025 |
| Sample type | Acceptance | A brief description of the sample | 1 Bag RAP |
| The quantity of what the sample constitutes | Production Start Up Evaluation | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | J. | Last name of sampler or witnessed by | Battles |
| Title of sampler | PEI | Telephone number of sampler | |
| Laboratory sample identification | D79966B | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Tullis Inc. - Northstate Asphalt (Redding CA) | Transportation Laboratory (TL) Number | 824078 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | Tullis, Northstate Asphalt |
|---|---|---|---|
| Aggregate Size | Aggregate Source | ||
| RAP Stockpile | Stockpile Size (tons) | ||
| Reclaimed Asphalt Pavement Mix Number |
Test Details
DIME Sample ID: 2025-07-21-29
DIME Test ID: 2025-07-21-29-3
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2025-07-29
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Sean McWithey
Date of test: 07/24/2025
Test procedure used?: Method A
Mass of the specimen basket assembly: 3017.8 g
Mass of the specimen and specimen basket assembly prior to ignition: 4759.7 g
Mass of HMA Sample prior to ignition: 1741.9 g
Mass Loss: 98.3 g
Mass of aggregate remaining after ignition: 1643.6 g
Correction Factor (Percent by mass of HMA Specimen): 0.00 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.17 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 5.47 %
General comments (publicly viewable) (Max 1000 characters): Pb(uncorrected)=5.47%
Test was verified on 7/29/2025 ✔