Summary for Test 2025-07-21-20-2
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 1000414 DEA: 034H8704 EFIS: 0319000070 |
|---|---|
| DIST-CO-RTE-PM | 03-SUT-99-25.0/26.2 |
| Award Date | 10/09/2024 |
| Closeout Date | Not set |
| Work Description | RDWY EXC, PLACE HMA-A AND CRCP, INSTALL SIGNAL AND LIGHTING. |
| Location Description | SUTTER COUNTY NEAR YUBA CITY FROM 0.6 MILE SOUTH TO 0.6 MILE NORTH OF OSWALD ROAD |
| QA Service Level | 1 (Verified on 07/30/2024) |
Sample Information
| Sample Taken Date | 07/21/2025 | Sample Unique Key | 20 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/25/2025 |
| Sample type | Quality Assurance | A brief description of the sample | 2 Boxes |
| The quantity of what the sample constitutes | 3/4" HMA w/ 15% RAP | From where was the sample collected | Source |
| First name of sampler or witnessed by | Brad | Last name of sampler or witnessed by | McKeehan |
| Title of sampler | TET | Telephone number of sampler | |
| Laboratory sample identification | Daily 25-114 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Teichert Woodland | Transportation Laboratory (TL) Number | C802587 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 3/4 inch | Lot number | 2 |
| Sublot number | 1 | HMA Mix Number | |
| Binder content (%) | 0.0 | Virgin binder PG | |
| Design binder PG | Binder Supplier | ||
| RAP content (%) | Not set | WMA Additives | |
| Antistrip type |
Test Details
DIME Sample ID: 2025-07-21-20
DIME Test ID: 2025-07-21-20-2
Testing Lab: CT D03 - Olivehurst Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2025-07-25
Test Results
What temperature unit is used?: Celsius
Input Type: Calculated
Tester's full name: Joshua Wilson
Date of test: 07/25/2025
Test procedure used?: Method A
Mass of HMA Sample prior to ignition: 2129.4 g
Mass Loss: 125.9 g
Correction Factor (Percent by mass of HMA Specimen): 0.74 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.02 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 5.17 %
General comments (publicly viewable) (Max 1000 characters): L1
OBC 4.7
Test was verified on 7/25/2025 ✔
