Summary for Test 2025-07-23-21-4
Test performed: CTM 229-June 2011Project Information
| Project Identifiers | Project ID: 1000369 DEA: 09378804 EFIS: 0919000002 |
|---|---|
| DIST-CO-RTE-PM | 09-MNO-395-R9.8/R12.6 |
| Award Date | 08/29/2024 |
| Closeout Date | Not set |
| Work Description | PLACE HMA AND ASPHALT BASE, RECYCLE PAVEMENT AND MODIFY ELECTRICAL. |
| Location Description | MONO COUNTY NEAR TOM\\\\\\\\\\\\\\\\'S PLACE FROM 0.5 MILE NORTH OF LOWER ROCK CREEK ROAD TO 1.3 MILES SOUTH OF SOUTH LANDING OVERCROSSING |
| QA Service Level | 1 (Verified on 09/02/2024) |
Sample Information
| Sample Taken Date | 07/23/2025 | Sample Unique Key | 21 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 07/24/2025 | Sample type | Acceptance |
| A brief description of the sample | Shoulder Backing | The quantity of what the sample constitutes | 2 Bags of Shoulder Backing |
| From where was the sample collected | Source | First name of sampler or witnessed by | Jeff |
| Last name of sampler or witnessed by | Puente | Title of sampler | QA |
| Telephone number of sampler | Laboratory sample identification | SB - 1 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Granite Five Bridges | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | Granite Five Bridges |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
| The plant number | A detailed description of where the material sample was collected | Stockpile @ Yard | |
| Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 3/8 inch | |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2025-07-23-21
DIME Test ID: 2025-07-23-21-4
Testing Lab: CT D09 - Bishop Field Laboratory
Test Method: CTM 229-June 2011: Method of Test for Durability Index
Test Release Date: 2025-07-25
Test Results
What test(s) are being run?: Coarse durability only
Input Type: Calculated
Tester's full name: Derek Carrington
Date of test: 07/25/2025
Coarse durability index: 96
General comments (publicly viewable) (Max 1000 characters): SB-1
Test was verified on 7/25/2025 ✔
