Summary for Test 2025-06-17-109-7

Test performed: AASHTO T240-23

Project Information

Project IdentifiersProject ID: 1000636
DEA: 024H03U4
EFIS: 0224000026
DIST-CO-RTE-PM02-PLU-89-12.9/20.0,20.6/21.0
Award Date12/20/2024
Closeout Date02/26/2026
Work DescriptionHMA OVERLAY.
Location DescriptionPLUMAS COUNTY IN AND NEAR GREENVILLE FROM 0.8 MILE SOUTH OF DIXIE CANYON ROAD TO WOLF CREEK BRIDGE AND FROM MILL STREET TO 0.4 MILE NORTH OF HILLSIDE DRIVE
QA Service Level1 (Verified on 09/24/2024)

Sample Information

Sample Taken Date06/17/2025 Sample Unique Key109
Date that the sample was received by the laboratory/organization performing the testing06/30/2025 Sample typeQuality Assurance
A brief description of the samplePG 58-22 PSE The quantity of what the sample constitutes2 Cans
From where was the sample collectedSource First name of sampler or witnessed byDamion
Last name of sampler or witnessed byFarley Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameWard Lake Plant
Transportation Laboratory (TL) Number857987 Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeAsphalt Binder Performance GradePG 58-22
ModifiedNo Lot number
Sublot number Tank number
Time of sample HMA SupplierWard Lake Plant
Certified Asphalt SupplierAlbina Asphalt (Klamath Falls Plant) - Klamath Falls OR MultigradeNo
Multigrade Type Asphalt Binder Mix Number
HMA TypeNot set HMA Supplier Mix ID NumberNot set

Test Details

DIME Sample ID: 2025-06-17-109
DIME Test ID: 2025-06-17-109-7
Testing Lab: Atlas - Denver
Test Method: AASHTO T240-23: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2025-07-25

Test Results


Is mass change based on one or two containers?: Two
Is mass change correction factor needed?: Yes
Input Type: Measured
Tester's full name: Atlas
Date of test: 07/16/2025
Any material loss from containers during heating process/testing?: No
Mass of container #1 before test (m1i): 206.862 grams
Mass of container #2 before test (m2i): 210.533 grams
Mass of container #1 after test (m1f): 206.684 grams
Mass of container #2 after test (m2f): 210.378 grams
Mass of empty container #1: 172.115 grams
Mass of empty container #2: 175.399 grams
Mass correction factor: 0.030
Average mass change: -0.447 percent
General comments (publicly viewable) (Max 1000 characters): Mass Change

Test was verified on 7/25/2025 ✔