Summary for Test 2025-04-17-43-3
Test performed: CTM 214-August 2010Project Information
| Project Identifiers | Project ID: 1001208 DEA: 022K6204 EFIS: 0225000120 |
|---|---|
| DIST-CO-RTE-PM | 02-SIS-96-46.6/46.6 |
| Award Date | 02/28/2025 |
| Closeout Date | 07/14/2025 |
| Work Description | Siskiyou 96 Potential Landslide DO Storm Damage |
| Location Description | IN SISKIYOU COUNTY NEAR HAPPY CAMP AT 2.3 MILES EAST OF GORDONS FERRY ROAD |
| QA Service Level | 1 (Verified on 04/22/2025) |
Sample Information
| Sample Taken Date | 04/17/2025 | Sample Unique Key | 43 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/17/2025 |
| Sample type | Production Start-Up | A brief description of the sample | 2 Bags of Plant Sand Untreated Sized Virgin Aggregate |
| The quantity of what the sample constitutes | Production Start-Up Evaluation and Annual Soundness Testing | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Giuliano | Last name of sampler or witnessed by | Giuntoli |
| Title of sampler | JET | Telephone number of sampler | |
| Laboratory sample identification | D79855C | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | J.F. Shea Construction — Fawndale Rock and Asphalt (Redding, CA) | Transportation Laboratory (TL) Number | 823565C |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-45-0017::Fawndale Rock Quarry (Redding, CA) |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
| The plant number | A detailed description of where the material sample was collected | Stockpile | |
| Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | fine | |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2025-04-17-43
DIME Test ID: 2025-04-17-43-3
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 214-August 2010: Method of Test for Soundness of Aggregates by Use of Sodium Sulfate
Test Release Date: 2025-07-24
Test Results
What size aggregate is being tested?: Fine Aggregate
Input Type: Calculated
Tester's full name: David Padilla
Date of test: 07/23/2025
Percentage Loss of material retained on #8 sieve: 1.3 %
Percentage Loss of material retained on #16 sieve: 2.2 %
Percentage Loss of material retained on #30 sieve: 1.9 %
Percentage Loss of material retained on #50 sieve: 2.2 %
Percentage Loss of material retained on #100 sieve: no data
Weighted Average Percent Loss of Fine Aggregate: 1.9 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 7/24/2025 ✔
