Summary for Test 2025-06-25-90-2
Test performed: CTM 521-June 2020Project Information
| Project Identifiers | Project ID: 1000612 DEA: 120R57U4 EFIS: 1223000131 |
|---|---|
| DIST-CO-RTE-PM | 12-ORA-405-11.4/24.2 |
| Award Date | 01/14/2025 |
| Closeout Date | Not set |
| Work Description | PLACE JPCP (RSC) AND RHMA, AND MODIFY ELECTRICAL SYSTEMS. |
| Location Description | ORANGE COUNTY FROM HARBOR BOULEVARD UNDERCROSSING IN COSTA MESA TO LOS ANGELES COUNTY LINE AT ROSSMOOR |
| QA Service Level | 1 (Verified on 09/30/2024) |
Sample Information
| Sample Taken Date | 06/25/2025 | Sample Unique Key | 90 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/26/2025 |
| Sample type | Quality Assurance | A brief description of the sample | 4x8 concrete cylinders |
| The quantity of what the sample constitutes | 6 | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | G3 | Last name of sampler or witnessed by | G3 |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | 25-0236 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | SPC Mobile Plant | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | G3-25-CTS-389 |
|---|---|---|---|
| The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | Unknown | |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | Dischard fron concrete truck into wheelbarrow. | Where the material sample would have been placed if not sampled | NB405 to WB22 connector |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2025-06-25-90
DIME Test ID: 2025-06-25-90-2
Testing Lab: CT D12 - Huntington Beach Field Laboratory
Test Method: CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete Cylinders
Test Release Date: 2025-07-24
Test Results
Unit system used?: US Units
Number of specimens: 2
Test performed: With no density determined
Input Type: Measured
Tester's full name: Dan Morris
Date of test: 07/23/2025
Capped in accordance with?: ASTM C617 - Sulfur Mortar Cap
Average diameter of cylinder 1: 4.01 in
Average diameter of cylinder 2: 4.00 in
Maximum load on cylinder 1: 75820 lb
Maximum load on cylinder 2: 79220 lb
Type of fracture pattern of cylinder 1: 3
Type of fracture pattern of cylinder 2: 3
Comment on any defect in either specimen or caps (Max 250 Characters): no data
Correction factor for cylinder 1: 1.00
Correction factor for cylinder 2: 1.00
Age of specimen: 28 days
Age of specimen in hours: 0 hours
Cross sectional area of cylinder 1: 12.63 in^2
Cross sectional area of cylinder 2: 12.57 in^2
Compressive strength of cylinder 1: 6003.2 psi
Compressive strength of cylinder 2: 6302.3 psi
Compressive strength (to nearest 10 psi): 6150 psi
General comments (publicly viewable) (Max 1000 characters):
Test File Attachments
| File Name | Extension | File Size | Date Uploaded | Test ID | Actions |
|---|---|---|---|---|---|
| 25-0236-28D | 135.43 KB | 07/24/2025 | 2025-06-25-90-2 | Info |
Test was verified on 7/24/2025 ✔
