Summary for Test 2025-07-07-51-1
Test performed: CTM 202-November 2011Project Information
| Project Identifiers | Project ID: 993678 DEA: 042Q8004 EFIS: 0419000050 COOP: 042836,042944 |
|---|---|
| DIST-CO-RTE-PM | 04-SM-101,92-US 101 & SR 92-10.9/12.1 & 11.8/13.4 |
| Award Date | 01/22/2025 |
| Closeout Date | Not set |
| Work Description | US 101/SR 92 INTERCHANGE AREA IMPROVEMENT :PROJECT WILL CONSTRUCT CONGESTION RELIEF IMPROVEMENTS AT THE US 101/SR 92 INTERCHANGE AREA. |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 09/15/2022) |
Sample Information
| Sample Taken Date | 07/07/2025 | Sample Unique Key | 51 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/07/2025 |
| Sample type | Quality Assurance | A brief description of the sample | CL 2 Aggregate Subbase |
| The quantity of what the sample constitutes | 11000g | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Jacob | Last name of sampler or witnessed by | Vega |
| Title of sampler | Mozamo Consultant QA | Telephone number of sampler | |
| Laboratory sample identification | SJ-070725-SA-SE-1 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Imported from previous contractor job | Transportation Laboratory (TL) Number | SJ-070725-1 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Hwy 101 SB Rt "FI" Line Drainage System No. 2 & 3 | Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | Jobsite Stockpile - Imported from previous contractor job | |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2025-07-07-51
DIME Test ID: 2025-07-07-51-1
Testing Lab: CT D04 - San Jose Construction Field Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2025-07-15
Test Results
What size aggregate is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: Yes
For Combined Gradation only, use #40 Sieve?: No
Input Type: Measured
Tester's full name: Jacob Vega
Date of test: 07/14/2025
| Sieve Size | Cumulative Mass Retained | Cumulative Percent Passing | ||||
|---|---|---|---|---|---|---|
| 11000 grams | ||||||
| 0.0 grams | 100 % | |||||
| 0.0 grams | 100 % | |||||
| 0.0 grams | 100 % | |||||
| 0.0 grams | 100 % | |||||
| 20.0 grams | 100 % | |||||
| 50.0 grams | 100 % | |||||
| 760.0 grams | 93 % | |||||
| 1490.0 grams | 86 % | |||||
| 3970.0 grams | 64 % | |||||
| 502.3 grams | ||||||
| 97.0 grams | 52 % | |||||
| 170.0 grams | 42 % | |||||
| 218.0 grams | 36 % | |||||
| 264.0 grams | 30 % | |||||
| 313.0 grams | 24 % | |||||
| 353.0 grams | 19 % | |||||
General comments (publicly viewable) (Max 1000 characters): Hwy 101 SB Rt "FI" Line Drainage System No. 2 & 3
Test was verified on 7/23/2025 ✔
