Summary for Test 2025-07-02-30-1

Test performed: CTM 231-March 2013

Project Information

Project IdentifiersProject ID: 993387
DEA: 07323404
EFIS: 0716000064
DIST-CO-RTE-PM07-LA-5-R59.5/R67.9
Award DateNot set
Closeout DateNot set
Work DescriptionPLACE CULVERT, REPLACE DRAINAGE SYSTEM, RECONST ROADWAY & EMBANKMENT.
Location DescriptionLOS ANGELES COUNTY AT VARIOUS LOCATIONS FROM LAKE HUGHES ROAD UNDERCROSSING TO 1.9 MILES NORTH OF TEMPLIN HIGHWAY UNDERCROSSING
QA Service Level1 (Verified on 12/06/2021)

Sample Information

Sample Taken Date07/02/2025 Sample Unique Key30
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing07/02/2025
Sample typeQuality Assurance A brief description of the sampleAggregate Base
The quantity of what the sample constitutes125 SY From where was the sample collectedJob Site
First name of sampler or witnessed byManuel Last name of sampler or witnessed byUy
Title of samplerMaterials Tester Telephone number of sampler9495016042
Laboratory sample identification25-2157 Linked DIME Sample ID
The fabricator/manufacturer/facility nameN/A Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure nameSB I-5 Approximately 2 Mile North of Templin off-ramp Sta 3483+70 to 3482+45 Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)N/A
The fabricator's/manufacturer's product name for the sampleAggregate Base The fabricator/manufacturer designation for the sampleCompaction Testing
The plant number A detailed description of where the material sample was collectedJobsite
Where the material sample would have been placed if not sampledJobsite Primary Aggregate Nominal Size3/4 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2025-07-02-30
DIME Test ID: 2025-07-02-30-1
Testing Lab: Alta Vista Solutions - Whittier
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2025-07-23

Test Results


Method Type:: Direct Read
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Manuel Uy
Date of test: 07/02/2025
Gage No.: 30515
Test No.: 1
Nuclear By: Manuel Uy
Non-Bias Plan No.: 5
Depth: 9"
Material No.: Aggregate Base
Material Type: Aggregate Base
Impact By: Manuel Uy
Standard Count Density: 2925 g/cc
Count or Density 1: 1771 g/cc
Count or Density 2: 1793 g/cc
Count or Density 3: 1850 g/cc
Standard Count Moisture: 1042 g/cc
Moisture Count 1: 369 g/cc
Moisture Count 2: 343 g/cc
Moisture Count 3: 319 g/cc
Sum of Count or Density: 5414 g/cc
Average of Count or Density: 1804.67 g/cc
Sum of Moisture Count: 1031 g/cc
Average of Moisture Count: 343.67 g/cc
Calculated Percent Relative Compaction: 95.4 %
Reported Percent Relative Compaction: 95 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 7/23/2025