Summary for Test 2025-07-14-56-7
Test performed: AASHTO T51-22Project Information
| Project Identifiers | Project ID: 993387 DEA: 07323404 EFIS: 0716000064 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-5-R59.5/R67.9 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | PLACE CULVERT, REPLACE DRAINAGE SYSTEM, RECONST ROADWAY & EMBANKMENT. |
| Location Description | LOS ANGELES COUNTY AT VARIOUS LOCATIONS FROM LAKE HUGHES ROAD UNDERCROSSING TO 1.9 MILES NORTH OF TEMPLIN HIGHWAY UNDERCROSSING |
| QA Service Level | 1 (Verified on 12/06/2021) |
Sample Information
| Sample Taken Date | 07/14/2025 | Sample Unique Key | 56 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/18/2025 |
| Sample type | Verification | A brief description of the sample | JMF verification sample |
| The quantity of what the sample constitutes | 1can | From where was the sample collected | Source |
| First name of sampler or witnessed by | Christian | Last name of sampler or witnessed by | christian Vulcan QC |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Vulcan Irwindale | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 58-16 |
|---|---|---|---|
| Modified | Lot number | ||
| Sublot number | Tank number | ||
| Time of sample | HMA Supplier | ||
| Certified Asphalt Supplier | San Joaquin Refinery - Bakersfield CA | Multigrade | No |
| Multigrade Type | Asphalt Binder Mix Number |
Test Details
DIME Sample ID: 2025-07-14-56
DIME Test ID: 2025-07-14-56-7
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T51-22: Standard Method of Test for Ductility of Asphalt Materials (Asphalt Binder)
Test Release Date: 2025-07-24
Test Results
Is a normal test obtainable?: Yes
Number of replicates tested: One
Input Type: Calculated
Tester's full name: Hussaya Leelakitrungruang
Date of test: 07/22/2025
Ductility of test #1 (D1): 75 cm
Ductility of sample: 75 cm
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 7/24/2025 ✔
