Summary for Test 2025-06-07-8-10
Test performed: AASHTO T240-23Project Information
| Project Identifiers | Project ID: 994309 DEA: 033H5404 EFIS: 0318000012 |
|---|---|
| DIST-CO-RTE-PM | 03-BUT-70-46.0/47.0 |
| Award Date | 02/10/2023 |
| Closeout Date | Not set |
| Work Description | RAISE ALIGNMENT, PLACE HMA, STRUCTURAL CONCRETE & BRIDGE RAIL. |
| Location Description | BUTTE COUNTY NEAR PARADISE FROM 0.8 MILE WEST OF SHADY REST AREA TO 0.2 MILE EAST OF SHADY REST AREA |
| QA Service Level | 1 (Verified on 10/04/2022) |
Sample Information
| Sample Taken Date | 06/07/2025 | Sample Unique Key | 8 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/30/2025 |
| Sample type | Quality Assurance | A brief description of the sample | PG 64-16 |
| The quantity of what the sample constitutes | 1 Can | From where was the sample collected | Source |
| First name of sampler or witnessed by | M | Last name of sampler or witnessed by | Atteberry |
| Title of sampler | TET | Telephone number of sampler | |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Valero-Benicia Asphalt Plant | Transportation Laboratory (TL) Number | 778833 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 64-16 |
|---|---|---|---|
| Modified | No | Lot number | 4 |
| Sublot number | 1 | Tank number | |
| Time of sample | HMA Supplier | Teichert - Hallwood Plant | |
| Certified Asphalt Supplier | Valero Marketing & Supply - Benicia CA | Multigrade | No |
| Multigrade Type | Asphalt Binder Mix Number |
Test Details
DIME Sample ID: 2025-06-07-8
DIME Test ID: 2025-06-07-8-10
Testing Lab: Atlas - Denver
Test Method: AASHTO T240-23: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2025-07-23
Test Results
Is mass change based on one or two containers?: Two
Is mass change correction factor needed?: Yes
Input Type: Measured
Tester's full name: Atlas
Date of test: 07/10/2025
Any material loss from containers during heating process/testing?: No
Mass of container #1 before test (m1i): 212.281 grams
Mass of container #2 before test (m2i): 208.760 grams
Mass of container #1 after test (m1f): 212.229 grams
Mass of container #2 after test (m2f): 208.702 grams
Mass of empty container #1: 177.259 grams
Mass of empty container #2: 173.975 grams
Mass correction factor: 0.030
Average mass change: -0.128 percent
General comments (publicly viewable) (Max 1000 characters): Mass Change
Test was verified on 7/23/2025 ✔
