Summary for Test 2025-05-20-108-2
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 215677 DEA: 044G0804 EFIS: 0412000332 COOP: 042676 |
|---|---|
| DIST-CO-RTE-PM | 04-SOL-80-R10.4/30.2 |
| Award Date | 01/18/2022 |
| Closeout Date | Not set |
| Work Description | Highway widening, overhead signs, and electronic toll system. |
| Location Description | In Solano County in Fairfield and Vacaville from 1.0 mile west of Red Top Road Undercrossing to 0.4 mile east of Leisure Town Road Overcrossing. |
| QA Service Level | 1 (Verified on 04/11/2022) |
Sample Information
| Sample Taken Date | 05/20/2025 | Sample Unique Key | 108 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/27/2025 |
| Sample type | Quality Assurance | A brief description of the sample | 1/2"RHMA-0-WMA |
| The quantity of what the sample constitutes | 100Tons | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Christian | Last name of sampler or witnessed by | Sousa |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Teichert Woodland | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Not Applicable |
|---|---|---|---|
| HMA Grading | 1/2 inch | Lot number | |
| Sublot number | HMA Mix Number | ||
| Binder content (%) | 0.0 | Virgin binder PG | |
| Design binder PG | Binder Supplier | ||
| RAP content (%) | Not set | WMA Additives | |
| Antistrip type |
Test Details
DIME Sample ID: 2025-05-20-108
DIME Test ID: 2025-05-20-108-2
Testing Lab: CT D04 - Concord Field Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2025-07-17
Test Results
What temperature unit is used?: Celsius
Input Type: Calculated
Tester's full name: Henry Concepcion
Date of test: 05/27/2025
Test procedure used?: Method A
Mass of HMA Sample prior to ignition: 1559.5 g
Mass Loss: 117.5 g
Correction Factor (Percent by mass of HMA Specimen): 0.57 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.19 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 6.77 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 7/17/2025 ✔
