Summary for Test 2025-06-27-35-2
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 994966 DEA: 073255U4 EFIS: 0722000129 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-605-20.2/26 |
| Award Date | 04/12/2023 |
| Closeout Date | Not set |
| Work Description | INDIVIDUAL SLAB REPLACEMENT, COLD PLANE AC |
| Location Description | LOS ANGELES COUNTY IN BALDWIN PARK AND IRWINDALE FROM ROUTE 10/605 SEPARATION TO 0.2 MILE NORTH OF ROUTE 210/605 SEPARATION |
| QA Service Level | 1 (Verified on 07/13/2023) |
Sample Information
| Sample Taken Date | 06/27/2025 | Sample Unique Key | 35 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/30/2025 |
| Sample type | Acceptance | A brief description of the sample | 3/4" RHMA-G |
| The quantity of what the sample constitutes | 750 Tons | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Arnold | Last name of sampler or witnessed by | Truong |
| Title of sampler | MREA | Telephone number of sampler | |
| Laboratory sample identification | 25-397 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | AAA Irwindale | Transportation Laboratory (TL) Number | A627251 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | RHMA-G |
|---|---|---|---|
| HMA Grading | 3/4 inch | Lot number | |
| Sublot number | HMA Mix Number | 106835 | |
| Binder content (%) | 7.5 | Virgin binder PG | |
| Design binder PG | Binder Supplier | ||
| RAP content (%) | Not set | WMA Additives | |
| Antistrip type |
Test Details
DIME Sample ID: 2025-06-27-35
DIME Test ID: 2025-06-27-35-2
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2025-07-16
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Daniel Gomez
Date of test: 07/16/2025
Test procedure used?: Method A
Mass of the specimen basket assembly: 4057.7 g
Mass of the specimen and specimen basket assembly prior to ignition: 6155.1 g
Mass of HMA Sample prior to ignition: 2097.4 g
Mass Loss: 162.5 g
Mass of aggregate remaining after ignition: 1934.9 g
Correction Factor (Percent by mass of HMA Specimen): 0.31 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.00 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 7.44 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 7/16/2025 ✔