Summary for Test 2025-07-15-36-1
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 1000926 DEA: 061G8304 EFIS: 0624000171 |
|---|---|
| DIST-CO-RTE-PM | 06-FRE-99-19.9/21.4 |
| Award Date | 03/27/2025 |
| Closeout Date | 11/10/2025 |
| Work Description | REPLACE CONCRETE SLABS WITH HMA, COLD PLANE AND PLACE HMA (TYPE A). |
| Location Description | FRESNO COUNTY IN FRESNO FROM 0.1 MILE NORTH OF CALIFORNIA AVENUE OVERCROSSING TO 0.1 MILE SOUTH OF EL DORADO STREET OVERCROSSING |
| QA Service Level | 1 (Verified on 03/04/2025) |
Sample Information
| Sample Taken Date | 07/15/2025 | Sample Unique Key | 36 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 07/16/2025 | Sample type | Quality Assurance |
| A brief description of the sample | 3/4” HMA Aggregate | The quantity of what the sample constitutes | 0-750 Tons Produced |
| From where was the sample collected | Manufacturer | First name of sampler or witnessed by | vulcan materials |
| Last name of sampler or witnessed by | Vulcan Materials | Title of sampler | Materials Tester |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Vulcan Material Ashlan Plant | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 3/4 inch | Lot number | 1 |
| Sublot number | 8 | HMA Mix Number | |
| Binder content (%) | 0.0 | Virgin binder PG | |
| Design binder PG | Binder Supplier | ||
| RAP content (%) | Not set | WMA Additives | |
| Antistrip type |
Test Details
DIME Sample ID: 2025-07-15-36
DIME Test ID: 2025-07-15-36-1
Testing Lab: CT D06 - Millbrook Field Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2025-07-16
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Tomas Silva
Date of test: 07/16/2025
Test procedure used?: Method A
Mass of the specimen basket assembly: 3980.7 g
Mass of the specimen and specimen basket assembly prior to ignition: 6170.3 g
Mass of HMA Sample prior to ignition: 2189.6 g
Mass Loss: 97.9 g
Mass of aggregate remaining after ignition: 2091.7 g
Correction Factor (Percent by mass of HMA Specimen): 0.00 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.00 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 4.47 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 7/16/2025 ✔