Summary for Test 2025-07-11-25-1
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 1000213 DEA: 120S1904 EFIS: 1219000104 |
|---|---|
| DIST-CO-RTE-PM | 12-ORA-22-R11.6/R12.5 |
| Award Date | 06/06/2024 |
| Closeout Date | Not set |
| Work Description | AUXILIARY LANE EXTENSION. |
| Location Description | ORANGE COUNTY IN SANTA ANA AND ORANGE FROM 0.1 MILE WEST OF SANTIAGO CREEK TO 0.2 MILE EAST OF CAMBRIDGE STREET OVERCROSSING |
| QA Service Level | 1 (Verified on 05/28/2024) |
Sample Information
| Sample Taken Date | 07/11/2025 | Sample Unique Key | 25 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/11/2025 |
| Sample type | Quality Assurance | A brief description of the sample | 3/4 HMA-A |
| The quantity of what the sample constitutes | 3/4 HMA-A | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Jimmy | Last name of sampler or witnessed by | Pham |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | 25-0722 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | AAA Corona | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 3/4 inch | Lot number | |
| Sublot number | HMA Mix Number | ||
| Binder content (%) | Not set | Virgin binder PG | Not set |
| Design binder PG | Not set | Binder Supplier | Not set |
| RAP content (%) | Not set | WMA Additives | Not set |
| Antistrip type | Not set |
Test Details
DIME Sample ID: 2025-07-11-25
DIME Test ID: 2025-07-11-25-1
Testing Lab: CT D12 - Huntington Beach Field Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2025-07-25
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: David Nguyen
Date of test: 07/14/2025
Test procedure used?: Method A
Mass of the specimen basket assembly: 3922.2 g
Mass of the specimen and specimen basket assembly prior to ignition: 5935.1 g
Mass of HMA Sample prior to ignition: 2012.9 g
Mass Loss: 91.9 g
Mass of aggregate remaining after ignition: 1921.0 g
Correction Factor (Percent by mass of HMA Specimen): 0.46 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.00 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 4.11 %
General comments (publicly viewable) (Max 1000 characters):
Test File Attachments
| File Name | Extension | File Size | Date Uploaded | Test ID | Actions |
|---|---|---|---|---|---|
| 2025AC-SP-0049 | 104.36 KB | 07/15/2025 | 2025-07-11-25-1 | Info |
Test was verified on 7/25/2025 ✔
